Mashnee task list

From MITNA
Revision as of 22:28, 26 October 2024 by Emeier (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

  • Fix Running Lights
  • Cotter pins for shroud turnbuckles

2024-25 Offseason work

Projects from observations

  • New mainsail cover
  • Patch or replace main hatch cover
  • New mast boot cover
  • Major dinghy repair or replacement
  • Re-affix hardware on main cabin skylight
  • Varnish the tiller
  • Replace the starboard bow light (is this separate from fixing it for the season?)
  • Consider the main halyard chafe--this will likely need replacement
  • Clean paddlewheel (speed sensor?)
  • Download B&G data
  • Messenger lines for halyards

Projected work based on routine intervals

  • Inspect sails; make worklist
  • Inspect running rigging; make replacement list
  • Inspect standing rigging (us or Dions?); assess lifespan
  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Renew mast varnish
  • Winterize engine
  • Oil and filter change on engine
  • Change raw water impeller on engine
  • Winterize and clean fuel/fuel tank
  • Winterize and clean the head
  • Launder interior fabrics
  • Clean boat thoroughly

Completed Tasks

  • Clean the dinghy motor propeller

Task Lists from Past Seasons

2023-2024: here

2022-2023: here