Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location

Tasks That Must Be Done First

  • Move mast from aboard to on ground
    • Frannie requested boatyard c.14+16Nov, approved estimate 19Nov
    • Paul at boatyard says he'll move it Tue/Wed 20/21Nov

Tasks That Must Be Done Soon (Before it Freezes)

  • Winterize engine (ThomS)
    • Change Engine Oil and Filter -DONE 19Nov ThomS
    • Change Transmission Fluid
    • Fog Cylinders
    • Drain and flush old antifreeze from cooling system and add fresh antifreeze
    • Drain salt-water from raw cooling system. and/or below
    • Add antifreeze to salt-water system/exhaust pot (bio-friendly) - DONE 16,19Nov ThomS
  • Freshwater cold/hot water system:
    • Drain 2 tanks - DONE 14Nov Thom
    • Sponge out Stbd tank (tank 1/2 inch water left after (above) draining & hand-pumping)
    • Add non-toxic antifreeze to freshwater system (NOT REQ'D, piping (hoses) are all dissembled, tanks emptied)
    • Drain water from pump, filters, accumulator - ONLY PUMP DONE 16Nov ThomS (didn't find other parts 19Nov)
    • Drain water-heater if not adding antifreeze (NOT REQ'D, was drained when hosing removed earlier)
  • Add non-toxic antifreeze to head/holding tank - DONE c.14Nov ThomS [discuss ]
  • Add antifreeze/rocksalt to bilge (or get the last few inches of water out) [discuss ]

- - DONE TEMPORARY (antifreeze) 16Nov ThomS - (boat-cover not on yet, so expect more rain(?)water)

Other Tasks That Should Be Done Soon

  • Install Winter Cover
    • Bring cover system from New Haven sailmaker - DONE ??Nov Amy, ThomS
    • Buy recommended tape (3M #893 filament tape) - DONE 16,19Nov ThomS
    • Install cover (after mast gets removed from boat) (crew)

-

  • Equipment needing care at Pavilion:
    • Remove battens and dutchman rig from mainsail & furl/fold neatly (main is at pavilion) (crew)
    • Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)
    • Get mainsail washed and perform any necessary maintenance (Frannie)
    • Get Genoa Washed (Frannie) [discuss ]


Done Tasks

  • Lock up bow anchor - DONE 04Nov - ThomS
  • Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
  • Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
  • Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
  • Make sawhorses to store mast on - DONE 12-13Nov - Dave A


Equipment Borrowed from Sailors, to be returned after winterizing

  • Extension ladder (return after spring launch) - ThomS
  • Hose (c.20-feet section) - ThomS