Mashnee task list
From MITNA
If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.
Please use the discussion page to discuss the prioritization and content of any of these tasks.
MIT Work
- Attach hatch struts on bow and lazarette hatches
- Hand stitch the 95 Jib luff again
- Scrub bilges around engine with Dawn or Joy to remove fuel leak residue
- Attach pre-feeder for jib
- Figure out spinnaker tack line setup
- Bungees on head hatch - Gavin
- Mounting for compass? New compass?
- Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
- Working jib - bolt rope on the luff frayed near the head - fix
- Stitch zipper stops for all sail bags
- Cunningham purchase system to easily be soft shackled on when needed - carabiner?
- Longer jib furling line to let us lead it aft? Soft shackle fairlead?
- Ring-dings for turnbuckles
- Replace eye for lee cloth on port berth
- Repair screen on the starboard porthole
- More permanent repair to companionway screen (+ better place to store)
- Add spreader patches to new 95 jib?
- Clean up wood around bilge panels for easier access
- Grease companionway tracks
- Spruce up soundproofing around the engine
- Enlarge spreader patches after repair on 160
- SOP + pictures of jackline setup
- Program new AIS MOB units and install
Dion's Work
- Get 1" half oval from Hamilton for Centerboard Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
- We need a new (3rd) cowl vent, one went missing at the start of the season. Dions
- to confirm: The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls
- Polish fuel tank- Boat should arrive with less than 1/3 tank
- Replace or repair two bent stanchions
North Work
- We need a new canvas boot for the mast-deck connection.
- Two little covers for furler line port.
Budget for Next Year
- New jib sheets (60', 9/16 polyester double braid)
- New main sheet (three-strand works well)
- Replace last two inflatable PFDs (2024 will be their 10th season)