Winter 2011/2012 Tasks
- bilge - keith
- remove old bilge hoses
- rewire and re-plumb primary (diaphram) bilge pump
- install secondary (submersible) bilge pump
- re-plumb and rebuild/replace manual bilge pumps
- septic system - sbussolari
- replace septic system hoses
- install holding tank
- rebuild toilet
- engine - mwall
- replace engine exhaust
- re-plumb engine cutoff
- ensure oil catch
- freshwater - simon
- install new hoses
- install new faucets in head/cabin
- install saltwater pre-wash to galley sink
- install new drain hoses
- refurbish and install pump, accumulator, filter
- rigging - wfoster
- diagnose and repair cracks on deck around jib halyard block
- prepare and paint bottom
- replace traveler hardware
- new traveler car
- new end blocks
- figure out better path for lines and cleats
- plug 4 holes in rudder
- replace zincs
Critical Tasks
- create as-is freshwater schematic
- create as-is 12v schematic
- create as-is 110v schematic
High Priority Tasks
- fabricate permanent oil catch-pan
Low Priority Tasks
Unprioritized Tasks
- replace engine indicator panel plexiglass - tyoung
- replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
- patch hole above garmin chartplotter - tyoung
- remount and seal garmin instruments - tyoung
- tidy up electrical wiring in nav area - tyoung
- repair dodger snaps
- clean bilge completely of oil
- repair and refinish wooden boarding ladder
- return main sheet block to original position to eliminate coaming wear
- lubricate frozen blocks at mast base
- rebuild winches
- replace boom vang tackle
- bring cleaning supplies to boat and dock box
- sponges
- simple green
- scrubbing brushes
- broom and dustpan
- paper towels
- rags
- 2 buckets
- install forward hatch retainer for keeping hatch open
- re-seat and de-humidify port and starboard compasses
- repair engine compartment panels and hinges
- fix nav station clock
- replace electrical switch panels
- replace nav station light with led
- strip brightwork and apply cetol
- new screws in lazarette latch hardware
- pour new spartite
- re-mount pulpit, back with g10?
- replace glass in hatches - head and main cabin
- replace fractured compass glass on pedestal
- seal holes in cockpit
- polish stainless steel pulpit and pushpit
- fabricate covers for electrical outlets in port lazarette
- create hangars for fenders in port lazarette
Completed Tasks
- 04feb12 remove headliner and trim - simon, mwall
- 04feb12 remove unused wiring - tyoung
- 04feb12 remove freshwater hoses and corroded fittings - simon
- 04feb12 remove riser and exhaust hose - mwall
- 04feb12 clean deck, collect old parts - keith
- 15jan12 eliminate rudder leaks - wfoster
- ??oct11 shorten dinghy painter to 2 dinghy boat lengths
- ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
- ??oct11 install float switch on primary bilge pump
- 01oct11 Installed interior dogging handles on aft hatch - sbussolari
- 24sep11 installed dorade vents - stefie tellex
- 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
- 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
- 15sep11 create as-is septic schematic - ted
- 11sep11 install security wire in dinghy - eric
- 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
- 11sep11 install winch holders in cockpit - mwall
- 11sep11 install dodger to reduce water through coaming and companionway
- 11sep11 install reefing line - thall
- 11sep11 replace screws on lazarette latches - eric, simon
- 11sep11 clean bilge - ksovie, bdeffenbaugh
- 11sep11 install mast boot tape - mwall
- 10sep11 install temporary oil catchpan
- 10sep11 inventory of lines on board - kwinstein and stellex
- 10sep11 septic diagram - kwinstein and stellex
- 10sep11 re-rig lazy jack lines - mwall
- 10sep11 tighten lifelines - sbussolari
- 03sep11 Commission Dinghy and berth at Waterboat Marina - ted