Mashnee task list

From MITNA
Revision as of 08:06, 12 November 2024 by Emeier (Talk | contribs)

Jump to: navigation, search

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

2024-25 Offseason work

Projects from observations

Observations are listed on Discussion page

  • New mainsail cover
  • Patch or replace main hatch cover
  • New mast boot cover
  • Major dinghy repair or replacement
  • Fix crack and re-affix hardware on main cabin skylight
  • Plane edges of sole boards (bilge boards/floorboards) so they don't stick and impede access to bilge
  • Varnish the tiller
  • Clean paddlewheel (speed sensor?)
  • Download B&G data
  • Messenger lines for halyards
  • Attend to mast problem areas under forestay tang and at heel (Dions)

Projected work based on routine intervals

  • Inspect running rigging; make replacement list
    • Consider the main halyard chafe--this will likely need replacement
  • Inspect standing rigging (us or Dions?); assess lifespan
  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Renew mast varnish (Dions has started Nov. 2024)
  • Oil and filter change on engine
  • Change raw water impeller on engine
  • Winterize and clean fuel/fuel tank
  • Winterize and clean the head
  • Launder interior fabrics

Shopping List

Completed Tasks

MIT

  • Clean the dinghy motor propeller (October 2024 LM)
  • Fix Running Lights (11-11-2024 SW)
    • Replace the starboard bow light (is this separate from fixing it for the season? Was not completed as a separate task)
  • Inspect Sails (Oct. 2024)
  • Clean boat thoroughly (Oct/Nov 2024)

Dions

  • Winterize engine (November 2024 Dions)

Task Lists from Past Seasons

2023-2024: here

2022-2023: here