Task List 2023-24

From MITNA
Revision as of 20:40, 20 September 2024 by Emeier (Talk | contribs)

Jump to: navigation, search

2023-2024 offseason work

Note: most items on this list are based on post-haul out observations, which are listed on the discussion page. The current task list is here

Inspections (items probably outside MIT knowledge base)

  • Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
  • Deck joints around chainplates
  • Mast just under the forestay tang for incipient rot
  • Cutlass bearings

Maintenance/Renewals

  • Varnish mast
  • Varnish bowsprit
  • Varnish cockpit coamings
  • Clean propeller
  • Winterize engine, freshwater system, and blackwater
  • Change fuel filters and impeller

Repairs

  • Cabin hatch top
  • Shave edges from weatherboards to alleviate sticking and jamming
  • Repair porthole screens; clean gaskets and threads around portholes
  • Fill holes on lazarette and bow hatch strut attachment and re-install
  • Shorten reefing hook
  • Sail repairs: tears in 140 and 95 jibs; mainsail

Gear Replacements

  • New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [1])
  • New jib sheets (60', 9/16 polyester double braid)
  • New topping lift
  • New mast boot

New Work

  • SOP + pictures of jackline setup

Budget for Next Year

  • Replace last two inflatable PFDs (2024 will be their 10th season)