Mashnee task list

From MITNA
Revision as of 08:01, 1 July 2022 by Zbz (Talk | contribs)

Jump to: navigation, search

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Summer 2022 Work

  • Replace engine oil line that has nicks in it and a slow leak
  • System for mounting radar and getting data to display (can we get B&G radar to talk w/ Raymarine Axios over NMEA2k)?
  • Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
  • Block for a flag halyard at the top of the mast interfering with jib?

Completed Tasks

  • Repaired forward hatch hinges