X-Dimension task list

From MITNA
Revision as of 07:19, 3 June 2013 by Mwall (Talk | contribs)

Jump to: navigation, search

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page if you disagree with the prioritization of any of these tasks.


High Priority Tasks

  • fabricate 8 replacement stanchion bases - mit central machine shop
  • label battery switch (1/2/both/off) to indicate actual function
  • install battery monitor - tyoung
  • install battery regulator - tyoung
  • repair gps screen - kwinstein
  • fabricate oil catch pan - central machine shop
  • bend lower section of trysail track

Halifax Tasks

  • re-core deck at dorade box above head
  • re-core old chainplate holes port and starboard
  • re-core deck at port aft
  • re-mount main sheet fittings on boom
  • refurbish pushpit eyes
  • install hoses and fittings for large manual bilge pump
  • install companionway hatch closure
  • install retaining bolt in base of mast 3/4" x 8"
  • install blower vent closure
  • replace stainless stanchion with aluminum stanchion
  • design and install floor panel retainers
  • put 15' lanyard on bucket
  • safety wire main sheet blocks (4)
  • put wooden plug on lanyard near each thru-hull
  • assemble first aid kit
  • assemble ditch bag
  • fabricate battery retainers
  • finish man overboard system
    • attach drogue
    • attach strobe
    • attach whistle
    • attach lifebouy
    • fabricate clip mount
  • make laminated charts
    • safety equipment location
    • thru-hull locations
  • get and install a paddle-wheel speedometer
  • put "mit bluewater" on miscellaneous buoyant equipment
    • lifejackets
    • blue cushions
    • lifesling
  • drills
    • man overboard
    • reefing
    • trysail and storm jib
    • anchor deployment
    • emergency steering


Low Priority Tasks

Unprioritized Tasks

  • swing compass, document with deviation card
  • fabricate polycarbonate storm board for companionway
  • fabricate hard bottom for zodiac (74" x 33", 4 panels)
  • fabricate pump retainer for zodiac
  • install/fabricate springs to make jib traveler cars stand up
  • fabricate hinckley-style or cable-actuated lazarette closures
  • clean fuel system
  • fabricate gasket for galley porthole
  • secure backstay chainplate base
  • install four hooks in forepeak for additional anchor rodes
  • repair gps antenna thru-rail fitting (port aft transom toerail)
  • re-bed pushpit, back with g10 (6 backing plates)
  • polish stainless steel pushpit
  • re-install port and starboard compasses
  • have winch barrels resurfaced (boom winch certainly; aft main winches, others??)
  • install pen holder at nav station
  • refinish cockpit table
  • strip brightwork and apply cetol
  • paint cabin interior ceiling
  • plug leaks
    • freshwater tank at forward end, significant seep into bilge
    • re-bed binnacle transmission/throttle to stop leaks at cables port and starboard
    • saltwater seep 1.5' forward of mast over keel near head - almost none so far in 2013
    • saltwater seep in upper bilge next to nav station - about 8 oz per week
    • saltwater seep at deepest keel bolt - about 4 oz per week
  • electrical system overhaul - tyoung
    • reconnect stereo
    • connect aux nav lights
    • replace missing bulbs and cabin light fixtures
    • install new ceiling lights
    • install 12v sockets
    • tidy up wiring behind breakers
    • install propane solenoid indicator at helm
    • install freshwater pump indicator at helm
    • install secondary bilge pump indicator at helm
  • replace light fixtures with led fixtures
  • install lights in port and starboard lazarettes
  • replace nav station light with led
  • move engine systems switch from inside stbd locker to switch panel in galley
  • repair scratches in red paint
    • port aft
    • port midships
    • port toerail
    • port bow
    • stbd midships
    • stbd aft quarter
  • cabin floor repairs
    • stringers to port of mast
    • side-to-side floor stringer aft of mast
    • floor edge support in main cabin starboard of nav table
    • floor edge support port of nav station seat
    • support at forward end of table base in main cabin


Completed Tasks

  • xxxxxxx tap turnbuckles - using cotter pins since they will not shear off
  • 21may13 remove coating from old life lines - uferner
  • 21may13 install radar reflector halyard - uferner
  • 21may13 fix fuel leak at fuel pump - ami
  • 20may13 lubricate pawls in cockpit winches - sbussolari
  • 20may13 mount manual bilge pump - mwall
  • 20may13 shock cord and block to retain flag halyard - sbussolari
  • 20may13 adjust primary bilge float switch level (lower by 2 inches) - sbussolari
  • 20may13 install new starboard lazy jack line - sbussolari
  • 19may13 clean and bleach head to remove urine smell
  • 19may13 clean and bleach vberth to remove sewage smells
  • 19may13 seal forward inspection portal of freshwater tank - mwall
  • 19may13 patch leaks in electric bilge hoses - mwall
  • 19may13 install pvc pipe around babystay - mwall
  • 19may13 install cotter pins in standing rigging turnbuckles - mwall
  • 19may13 rebuild manual bilge pump mount - mwall
  • 18may13 pressurize and test stove - sbussolari
  • 18may13 install stove stops - sbussolari
  • 18may13 flush freshwater tank and hoses - sbussolari
  • 18may13 fix fuel leak - atraina, mwall
  • 18may13 clean deck and topsides - atraina, sbussolari
  • 18may13 clean dinghy - mwall
  • 18may13 fabricate bucket handles - atraina
  • 18may13 diagnose freshwater tank leak - atraina, sbussolari
  • 18may13 replace starboard spinnaker tack cheek block - bussolari
  • 18may13 install cockpit pad-eyes - mwall, sbussolari
  • 18may13 install man overboard pole - atraina
  • 18may13 replace dinghy painter with floating line - atraina
  • 18may13 install wood panels over switch and engine panels
  • 18may13 re-bed pulpit, back with g10 backing plate 2x 3.5" x 4.5" - sbussolari, mwall
  • 17may13 ground pushpit to other grounds - mwall
  • 17may13 fabricate backing panels for wiring - mwall
  • 17may13 install cockpit pad-eyes - mwall
  • 17may13 install cubby retainers - silas
  • 17may13 mount cockpit switch panel cubby - mwall
  • 16may13 install cubby retainers - silas
  • 16may13 dry fit cockpit switch panel - tyoung
  • 16may13 seal lazarette hinges - mwall
  • 16may13 inject silicone sealant into aft end of mast boot - mwall
  • 12may13 fabricate cubby cover retainers (stainless bar plus stainless bolt) - central machine shop
  • 12may13 red tender to waterboat marina, then returned to pavilion for better fenders - atraina, sbussolari, mwall
  • 12may13 tune shrouds - silas, atraina, mwall
  • 12may13 install jib and main - sbussolari, atraina, austin, eben, silas, dan
  • 11may13 repair main sail cars - north sails
  • 11may13 repair 150 jib - north sails
  • 11may13 repair 133 jib - sail has been disposed of
  • 11may13 repair spinnaker - north sails
  • 11may13 install web and rings in main reef cringles - north sails
  • 10may13 re-weld starboard stanchion of pulpit - mit central machine shop
  • 10may13 install new lifeline fittings in pulpit - mit central machine shop
  • 07may13 install new lazarette gaskets - mwall
  • 06may13 remove old seals from lazarette lids - silas, eben
  • 06may13 refurbish large winch - eben
  • 06may13 refurbish large manual bilge pump - sdynes, mwall, uferner
  • 04may13 seal mast boot - mwall
  • 04may13 remove silicone flash from new hatch lenses - mwall
  • 03may13 another attempt to stop timing case oil leaks - sdynes
  • 02may13 lubricate rudder chain - tyoung
  • 02may13 install binnacle compass - tyoung
  • 02may13 install cleat on deck next to stbd mast winch (stbd jib halyard) - sdynes, mwall
  • 02may13 reinstall timing cover on engine to fix oil leak - sdynes
  • 02may13 clean and clamp freshwater fill hose - mwall
  • 02may13 install windex, garmin wind instrument, tricolor at top of mast - mwall, sdynes
  • 02may13 remove mid lifelines, diagnose stanchion bases - mwall
  • 01may13 trim silicone flash from windows - mwall
  • 01may13 diagnose apparent oil leak aft of engine - coming from engine mount, not engine - mwall
  • 30apr13 diagnose bilge leaks - 2 seeps forward of stringer by nav station - mwall
  • 30apr13 plug pulpit holes in deck - mwall
  • 30apr13 drill holes for starboard cleat - mwall
  • 30apr13 assemble zodiac - mwall
  • 30apr13 install new lines on zodiac - mwall
  • 29apr13 install halyards - sdynes
  • 29apr13 install boom and vang - sdynes, mwall
  • 29apr13 remove lifelines and pulpit - sdynes, mwall
  • 29apr13 trim silicone flash from windows - mwall
  • 28apr13 fix dinghy floor leak - sbussolari, tyoung
  • 28apr13 fix dinghy fuel leak - there is no leak. pumping too many times results in fuel overflow.
  • 26apr13 align and tension steering cable - tyoung
  • 26apr13 repair forward starboard handrail attach point - mwall
  • 25apr13 fill holes and rotted core in foredeck - mwall
  • 25apr13 mount starboard mid-cabin winch - dan, mwall
  • 25apr13 fill rotted core near forward end of starboard handrail - mwall
  • 25apr13 replace starboard cabin windows - dan, mwall
  • 24apr13 install second spinnaker halyard block - mwall
  • 24apr13 paint bottom second coat - sdynes, eyal, dan
  • 24apr13 install large manual pump strum box - mwall
  • 23apr13 Fix the Engine oil leaks - sdynes et al
  • 23apr13 seal cockpit holes - 10 on forward bulkhead, 2 or 3 on starboard bulkhead, 2 or 3 port bulkhead - mwall
  • 22apr13 install trysail track 2x 12' 7/8" - mwall, eben
  • 22apr13 install port forward cabin window - mwall, ebrown
  • 22apr13 fabricate strum box for large manual bilge hose - sdynes
  • 22apr13 trim spreader cotter pins - gigi, diane
  • 22apr13 install halyard messengers - eben, tyoung
  • 22apr13 epoxy starter battery box - ilia
  • 22apr13 paint house battery box - diane
  • 22apr13 first coat bottom paint - ilia, eben, daniel, gigi, diane, sdynes
  • 22apr13 replace tab on mast foot platform - mwall
  • 21apr13 replace bad house battery - tyoung
  • 21apr13 grind and patch bottom flaws - sdynes, mwall
  • 21apr13 replace defective forward bilge float switch - tyoung
  • 21apr13 refurbish binnacle and steering assembly - tyoung
  • 18apr13 paint hatch locking bars with epoxy paint - diane, mwall
  • 18apr13 patch hole center forward of keel - mwall
  • 18apr13 patch hole starboard side of keel - mwall
  • 18apr13 install port aft cabin window - mwall
  • 17apr13 replace cabin hatch lens - mwall
  • 17apr13 install scupper drain hoses - mwall
  • 17apr13 sand bottom - sdynes, diane, dan
  • 15apr13 replace head hatch lens - sbussolari, mwall
  • 14apr13 fix long batten from main sail - tyoung
  • 14apr13 install bronze T fittings for cockpit drainage (1.5" hoses) - mwall
  • 14apr13 re-bed mast base ring - sbussolari, mwall
  • 14apr13 apply propspeed to prop and shaft - sbussolari
  • 11apr13 replace dodger track end caps - mwall
  • 11apr13 replace prop shaft zincs (1.25" shaft diameter) - mwall
  • 11apr13 grease rudder post - mwall
  • 11apr13 replace rudder post zirt fitting - mwall
  • 06apr13 tighten rudder stuffing box - tyoung, kcurry, mwall
  • 06apr13 replace cotter pins on mast - uferner
  • 06apr13 install new babystay brace - mwall
  • 06apr13 refurbish baby stay fast pins and shackles
  • 06apr13 fix holding tank leak - sbussolari
  • 06apr13 move lower fuel pump to less exposed location - sdynes
  • 06apr13 inventory anchor rhodes - diane (brown - 100'; orange/blue - 90'; white - 230')
  • 04apr13 swap out lube oil filter mount for spin-on mount - sdynes
  • 04apr13 move fuel oil filter from inside stbd locker to inside steps - sdynes
  •  ??mar13 rebuild starboard mid-cabin winch - dan and adam
  •  ??mar13 replace forward gasket on engine to stop oil leaks - sdynes et al
  •  ??mar13 replace aft gasket on engine to stop oil leaks - sdynes et al
  •  ??mar13 evaluate and fix engine oil leaks - sdynes et al
  •  ??mar13 repair sail cover - wally
  •  ??mar13 repair dodger zipper - wally
  •  ??mar13 repair dodger snaps - wally
  •  ??mar13 repair carpet edges in companionway board storage rack - mwall
  •  ??mar13 reverse engine kill cable mechanism - tyoung
  • 27mar13 trim flash from forward hatch - mwall
  • 16mar13 Switched out oil lube filter mount for spin-on mount - uferner
  • 09mar13 Repaired boom vang (note adjustment procedure in systems section) - sbussolari
  •  ??feb13 design and implement drain for well beneath mast - mwall
  •  ??feb13 cut 1/2" drain hole in mast base plate - mwall
  •  ??feb13 clean bilge - mwall
  •  ??jan13 fair keel - greg
  •  ??jan13 evaluate (and replace) foam in keel - greg
  •  ??jan13 rebuild rudder - greg
  • 12nov12 winterize boat (engine, halyards, sails, freshwater, septic) - sbussolari, ksovie, mwall
  • 12nov12 repair wood trim on vberth sink access panel - mwall
  • 27oct12 install forward hatch retainer for keeping hatch open - mwall
  •  ??oct12 connect propane solenoid - tyoung
  • 06jul12 boom vang tube - delivered
  • 29jun12 boom vang spring - ordered
  • 19sep12 worked on port forward winch which was turning both ways. Winch is functional, but needs to be rebuilt - sdynes
  • 12sep12 added chafe protection to oil cooler hose (was rubbing on engine mount) - sdynes, dweisman
  • 12sep12 replaced steaming nav light and lens - tyoung, sdynes, lbush, dweisman
  • 12sep12 replaced spinnaker halyard - sdynes, lbush, dweisman, tyoung
  • 12sep12 changed hailing port on transom to Cambridge, MA - tyoung, rdisbrow, lbush, dweisman
  • 12sep12 fender step installed tyoung
  • 10aug12 changed transmission oil - sdynes
  • 10aug12 lubricated main outhaul track and car with a light coating of winch grease - sdynes
  • 10aug12 unscrewed cap ove rudder post, used anti-sieze compound when replacing - sdynes
  • 13jul12 re-bed forward hatch plexiglass and hinges - mwall, jwarner, jspitzberg
  • 13jul12 re-install mast boot - mwall
  • 13jul12 re-bed chain plates - mwall, jwarner, jspitzberg
  • 13jul12 install pvc storage tubes in starboard lazarette - jwarner, jspitzberg
  • 12jul12 6 pfds to boat - tyoung
  • 12jul12 2 life jackets into dock box (from pavilion?) - tyoung
  • 12jul12 re-mount companionway board storage rack in starboard lazarette - mwall
  • 11jul12 repair and refinish wooden boarding ladder - tyoung
  • 11jul12 wrenches into wraps - jwarner
  • 11jul12 install wastebin on galley cabinet door - jwarner
  • 11jul12 rebuild companionway board storage box - tyoung
  • 11jul12 refurbish steering wheel brake - tyoung
  • 11jul12 re-bed traveler rail - port end is loose - sbussolari
  • 11jul12 coaming - gaps between wood and fiberglass - mwall
  • 10jul12 connect GPS NMEA0183 output to VHF radio - tyoung
  • 07jul12 connect footlights - tyoung
  • 07jul12 replace corroded nav light sockets at bow - tyoung
  • 07jul12 connect blower - tyoung
  • 07jul12 connect fridge - tyoung
  • 06jul12 connect wind/depth/GPS instruments via NMEA2000 network - tyoung
  • 04jul12 connected stern light - tyoung
  • 03jul12 connect sidelights - tyoung
  • 03jul12 replace traveler hardware - sbussolari
  • 03jul12 install new traveler car - sbussolari
  • 03jul12 install new end controls - sbussolari
  • 03jul12 re-bed head dorade tube and dorade - mwall
  • 03jul12 seal cockpit holes - 2 compasses - mwall
  • 03jul12 install new blower hood at stbd aft toerail - mwall
  • 03jul12 remount and seal garmin instruments
  • 02jul12 fix oil filter leak - big leak at top of blue filter housing on aft end of engine - sdynes
  • 02ul12 fabricate oil catch pan - temporary solution from three foil trays - sdynes
  • 01jul12 install dinghy registration sticker - tyoung
  • 01jul12 stow remaining bluewater gear at pavilion - mwall, tyoung
  • 01jul12 tune life lines, recondition turnbuckles and shackles - ebrown
  • 01jul12 re-seat pulpit - ebrown
  • 01jul12 bring remaining gear to boat - sbussolari, tyoung
  • 01jul12 rebed main sheet (2) and main halyard (1) cheek blocks - sbussolari, brehrig
  • 01jul12 reinstall dinghy u-bolt, dock lines, and lock - mwall
  • 01jul12 fix dinghy painter - mwall
  • 01jul12 unplug propane enclosure drain - brehrig
  • 01jul12 clean propane enclosure - brehrig
  • 01jul12 clean ice box - mwall
  • 01jul12 clean head ceiling - ebrown
  • 01jul12 plug two holes in aft toerail - mwall
  • 01jul12 fabricate oil catch pan - temporary solution from two foil trays - mwall
  • 30jun12 installed lock on dock box - mwall
  • 30jun12 re-tie dinghy bow/stern lines - ebrown
  • 30jun12 properly configure dinghy straps - ebrown
  • 30jun12 sort out dinghy equipment (extra pumps/hoses, etc), put single spare in dock box - ebrown
  • 30jun12 install fast pins on locking bars - mwall
  • -skip-- replace alternator belt (40" 25-9425) - does not need replacement, as smaller will not work - sdynes
  • 30jun12 replace broken boom vang tackle (6:1) and line - mwall
  • 30jun12 5 halyard blocks at base of mast for 1/2" line - sbussolari
  • 30jun12 2 main sheet blocks for 1/2" line - mwall
  • 30jun12 install exhaust riser insulation - mwall, tyoung
  • 30jun12 install jib - sbussolari
  • 30jun12 clean and grease rudder rack and pinion - ebrown
  • 30jun12 mount gps and instruments - tyoung
  • 30jun12 mount new blower - mwall
  • 29jun12 glass over former cooler access on port lazarette - sbussolari, tyoung
  • 29jun12 glass over hole above garmin chartplotter - tyoung
  • 29jun12 strip and bleach ceiling above starboard berths - ebrown, sbussolari
  • 29jun12 strip and bleach ceiling above port berths - ebrown
  • 29jun12 strip and bleach ceiling above nav berth - ebrown
  • 29jun12 procure bag for dinghy pump/hose - purple bag at pavilion, can hang from dingy seat
  • 28jun12 manual bilge pump tested and repaired - uferner, scott
  • 28jun12 aft pair of 32in winches rebuilt - uferner, scott
  • 28jun12 clean cabinets between main cabin and v-berth
  • 28jun12 clean v-berth hull - mwall
  • 28jun12 drill hole in nav station floorboard - mwall
  • 24jun12 replace forward hatch gasket - sdynes
  • 24jun12 adjust seal on prop shaft to reduce shaft heat buildup - sdynes, tyoung
  • 24jun12 install navigation lights sub-panel - tyoung
  • 24jun12 re-install radio, radar, & engine instrument panel
  • 24jun12 install horn button
  • 23jun12 Re-install engine instruments panel - tyoung
  • 23jun12 replace engine indicator panel plexiglass - tyoung
  • 22jun12 replace raw water strainer mesh - sdynes
  • 22jun12 replace raw water strainer gasket - sdynes
  • 18jun12 secure freshwater faucet in v-berth - mwall
  • 18jun12 refurbish dinghy - ksovie, ebrown
  • 18jun12 rebed freshwater in thru-deck - sbussolari, sdynes
  • 18jun12 install mast boot (temporary) - mwall
  • 18jun12 repair main cabin floor support port side of mast base - simon
  • 18jun12 install hooks in v-berth cabinets - uferner
  • 18jun12 diagnose and repair fuel supply problem - sdynes
  • 16jun12 christen the head - sbussolari, mwall
  • 16jun12 leak-test septic system - sbussolari
  • 16jun12 clean and deploy guppy - mwall
  • 16jun12 clean and install dorade vents - uferner
  • 16jun12 plug leaks in mast ring - sbussolari, mwall
  • 16jun12 plug holes in nav table - sbussolari
  • 16jun12 inflate fenders - uferner
  • 16jun12 seal deck holes - 30-some screw holes for interior grab rails - sbussolari
  • 16jun12 seal deck holes - 6 from old jam cleats - sbussolari
  • 16jun12 seal deck holes - 6 from old aluminum track along starboard side of companionway - sbussolari
  • 16jun12 seal deck holes - re-bed old baby-stay hard point - sbussolari
  • 16jun12 seal cockpit holes - 2 in port lazarette drain gulley - sbussolari
  • 15jun12 re-thread and refurbish soap dispenser at galley - mwall
  • 14jun12 repair engine compartment panels and hinges - danderson
  • 12jun12 secure nav station stool - mwall
  • 12jun12 install new exhaust riser - mwall
  • 12jun12 reconnect coolant hoses - mwall
  • 12jun12 flush and replace coolant - tyoung, mwall
  • 11jun12 replace two port-side oil hoses - tyoung
  • 11jun12 replace engine exhaust - sdynes
  • 11jun12 replace seawater impeller - sdynes
  • 11jun12 replace/clean primary fuel filter - sdynes
  • 11jun12 replace/clean fuel/water separator - sdynes
  • 10jun12 change oil - sdynes, tyoung
  • 10jun12 re-plumb engine shutoff - tyoung
  •  ??jun12 strip peeling paint in cabin interior - tyoung, ksovie, others
  •  ??jun12 bleach interior surfaces to kill mildew - tyoung, ksovie, others
  • 02jun12 reinstalled v-berth sink hatch with finger catch - dca
  • 02jun12 repaired galley floor stringer - dca
  • 26may12 reinstalled companionway steps - dca
  • 21may12 second coat of bottom paint to stbd keel surface - mwall
  • 21may12 re-bed chain plates - mwall (6 hours)
  • 21may12 fabricate steel backing plates for part of large chain plates
  • 20may12 buff topsides - mwall (3 hours)
  • 20may12 install mast hardware - tyoung
  • 20may12 repair more wiring - tyoung
  • 20may12 apply fastprop to propellor and shaft - ebrown
  • 20may12 fabricate g10 backing plates for chain plates - mwall
  • 20may12 seal rotted core at chain plates - mwall
  • 20may12 paint starboard keel surface first coat - mwall
  • 20may12 paint head thru-hull first coat - mwall
  • 19may12 check and rewire 12V system - tyoung
  • 19may12 second coat of paint on mast spots - eric
  • 19may12 remove blower vent, worn jam cleat - larry
  • 19may12 second coat of bottom paint touchup - uferner
  • 19may12 apply more filler on keel - uferner
  • 19may12 install head thru-hull - simon
  • 19may12 remove corroded backing plates for chain plates - mwall
  • 19may12 replace exhaust thru-hull - mwall
  • 19may12 paint transducer - mwall
  • 18may12 remove compasses for refurbishment - tyoung
  • 18may12 install new floorboard - sbussolari
  • 18may12 plumb refurbished toilet - sbussolari
  • 18may12 install new breakers, wiring - tyoung
  • 18may12 grind epoxy from chainplates - mwall
  • 18may12 install new starter motor - tyoung, mwall
  • 18may12 bottom paint touchup - mwall
  • 17may12 clean waterline - dhealey, uferner
  • 17may12 polish prop - retro
  • 13may12 repair broken floor support in galley - danderson
  • 17may12 install terminator for mast wind instruments - tyoung
  • 17may12 install horn on mast - tyoung
  • 17may12 paint mast - mar, mangle, tyoung
  • 11may12 repair mast corrosion - mwall, kwinstein, tyoung, sbussolari
  •  ??may12 install bilge switches (2, illuminated when pump on) - tyoung
  •  ??may12 tidy up electrical wiring in nav area - tyoung
  • 17may12 sand/grind cracks in bottom - sdynes
  • 17may12 apply filler to bottom cracks - sdynes, tyoung, retro
  • 17may12 paint the bottom - dhealey, uferner, sdynes, mar, retro
  • 17may12 install new engine mount - mangle
  • 14may12 clear obstructions from drainage tubes under primary winches - tyoung
  • 14may12 remove unused wedges from worn jam cleats - mwall
  • 14may12 remove starter motor - tyoung, mwall
  • 14may12 sand hull to prep for paint - retro, dweisman
  • 14may12 clean waterline - uferner, dweisman
  • 14may12 sand/grind/feather keel - sdynes
  • 14may12 sand epoxy on mast - ebrown
  • 14may12 plug 4 holes in rudder - retro
  • 14may12 replace zincs on propellor shaft - dweisman
  • 14may12 remove 5200 scraps from thru-hulls - tyoung, mwall
  •  ??mar12 replace septic system hoses - sbussolari
  •  ??may12 install holding tank - sbussolari
  •  ??may12 rebuild toilet - sbussolari
  •  ??may12 fabricate head floorboard - sbussolari, thall
  • 10may12 figure out better path for traveler lines and cleats - decision made to use 4:1 traveler with cam cleats on ends
  •  ??mar12 replace fractured compass glass on pedestal
  •  ??apr12 fix nav station clock - tyoung
  •  ??may12 install saltwater washdown pump in galley - simon
  •  ??may12 freshwater: install new hoses - simon
  •  ??may12 freshwater: install new faucets in head/cabin - simon
  •  ??may12 freshwater: install saltwater pre-wash to galley sink - simon
  •  ??may12 freshwater: install new drain hoses - simon
  •  ??may12 freshwater: refurbish and install pump, accumulator, filter - simon
  • 10may12 re-core part of foredeck - wfoster
  •  ??apr12 diagnose and repair cracks on deck around jib halyard block
  •  ??apr12 inspect chainplates and mast rigging
  •  ??apr12 re-plumb and rebuild/replace manual bilge pumps (one manual pump installed)
  •  ??apr12 rewire and re-plumb primary (diaphram) bilge pump
  •  ??apr12 install secondary (submersible) bilge pump
  • 26apr12 drill hole for saltwater hand pump
  •  ??mar12 install new thru-hull valves
  • 18feb12 remove toilet floorboard for repair - sbussolari
  • 18feb12 remove batteries from boat - ebrown, tyoung
  • 18feb12 clean bilge well - ebrown
  • 18feb12 clean bildge - ebrown, mwall
  • 18feb12 clean engine - mwall
  • 18feb12 remove hot water heater - tyoung
  • 18feb12 remove propane fittings - tyoung
  • 18feb12 clean cockpit hull interior - kwinstein, tyoung
  • 18feb12 refine septic system layout - sbussolari
  • 18feb12 refine bilge system layout - kwinstein
  • 18feb12 tighten tent - ebrown
  • 15feb12 clean bilge - mwall, ebrown, swatts
  • 15feb12 remove old bilge hoses - kwinstein
  • 04feb12 remove headliner and trim - simon, mwall
  • 04feb12 remove unused wiring - tyoung
  • 04feb12 remove freshwater hoses and corroded fittings - simon
  • 04feb12 remove riser and exhaust hose - mwall
  • 04feb12 clean deck, collect old parts - keith
  • 15jan12 eliminate rudder leaks - wfoster
  •  ??oct11 shorten dinghy painter to 2 dinghy boat lengths
  •  ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
  •  ??oct11 install float switch on primary bilge pump
  • 01oct11 Installed interior dogging handles on aft hatch - sbussolari
  • 24sep11 installed dorade vents - stefie tellex
  • 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
  • 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
  • 15sep11 create as-is septic schematic - ted
  • 11sep11 install security wire in dinghy - eric
  • 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
  • 11sep11 install winch holders in cockpit - mwall
  • 11sep11 install dodger to reduce water through coaming and companionway
  • 11sep11 install reefing line - thall
  • 11sep11 replace screws on lazarette latches - eric, simon
  • 11sep11 clean bilge - ksovie, bdeffenbaugh
  • 11sep11 install mast boot tape - mwall
  • 10sep11 install temporary oil catchpan
  • 10sep11 inventory of lines on board - kwinstein and stellex
  • 10sep11 septic diagram - kwinstein and stellex
  • 10sep11 re-rig lazy jack lines - mwall
  • 10sep11 tighten lifelines - sbussolari
  • 03sep11 Commission Dinghy and berth at Waterboat Marina - ted