== Winter/Spring 2011 Tasks ==
+
== Winter 2011/2012 Tasks ==
* eliminate rudder leaks
+
* bilge - keith
* rewire and re-plumb primary bilge pump
+
** remove old bilge hoses
* install secondary bilge pump
+
** rewire and re-plumb primary (diaphram) bilge pump
* re-plumb manual bilge pump
+
** install secondary (submersible) bilge pump
 
+
** re-plumb and rebuild/replace manual bilge pumps
 +
* septic system - sbussolari
 +
** replace septic system hoses
 +
** install holding tank
 +
** rebuild toilet
 +
* engine - mwall
 +
** replace engine exhaust
 +
** re-plumb engine cutoff
 +
** ensure oil catch
 +
* freshwater - simon
 +
** install new hoses
 +
** install new faucets in head/cabin
 +
** install saltwater pre-wash to galley sink
 +
** install new drain hoses
 +
** refurbish and install pump, accumulator, filter
 +
* rigging - wfoster
 +
** diagnose and repair cracks on deck around jib halyard block
 +
* prepare and paint bottom
 +
* replace traveler hardware
 +
** new traveler car
 +
** new end blocks
 +
** figure out better path for lines and cleats
 +
* plug 4 holes in rudder
 +
* replace zincs
  
 
== Critical Tasks ==
 
== Critical Tasks ==
Line 19: Line 42:
 
== High Priority Tasks ==
 
== High Priority Tasks ==
  
* identify source of bilgewater (bilge filled while sailing 10sep11)
 
* install float switch on primary bilge pump
 
 
* fabricate permanent oil catch-pan
 
* fabricate permanent oil catch-pan
  
Line 27: Line 48:
 
== Unprioritized Tasks ==
 
== Unprioritized Tasks ==
  
 +
* replace engine indicator panel plexiglass - tyoung
 +
* replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
 +
* patch hole above garmin chartplotter - tyoung
 +
* remount and seal garmin instruments - tyoung
 +
* tidy up electrical wiring in nav area - tyoung
 
* repair dodger snaps
 
* repair dodger snaps
* tidy up electrical wiring in nav area
 
 
* clean bilge completely of oil
 
* clean bilge completely of oil
* diagnose and repair cracks on deck around jib halyard block
 
* remount and seal garmin instruments
 
* patch hole above garmin chartplotter
 
* replace traveler blocks
 
 
* repair and refinish wooden boarding ladder
 
* repair and refinish wooden boarding ladder
* re-rig traveler for better loading and less wear
 
 
* return main sheet block to original position to eliminate coaming wear
 
* return main sheet block to original position to eliminate coaming wear
 
* lubricate frozen blocks at mast base
 
* lubricate frozen blocks at mast base
 
* rebuild winches
 
* rebuild winches
 
* replace boom vang tackle
 
* replace boom vang tackle
* replace septic system
 
** new hoses
 
** new holding tank
 
** rebuild toilet pump
 
 
* bring cleaning supplies to boat and dock box
 
* bring cleaning supplies to boat and dock box
 
** sponges
 
** sponges
Line 56: Line 72:
 
* repair engine compartment panels and hinges
 
* repair engine compartment panels and hinges
 
* fix nav station clock
 
* fix nav station clock
* replace engine indicator panel plexiglass
 
 
* replace electrical switch panels
 
* replace electrical switch panels
 
* replace nav station light with led
 
* replace nav station light with led
Line 69: Line 84:
 
* fabricate covers for electrical outlets in port lazarette
 
* fabricate covers for electrical outlets in port lazarette
 
* create hangars for fenders in port lazarette
 
* create hangars for fenders in port lazarette
* re-seat toilet (platform pulls up to starboard when pumping)
 
* shorten dinghy painter to 2 dinghy boat lengths
 
* replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights)
 
  
 
== Completed Tasks ==
 
== Completed Tasks ==
  
 +
* 04feb12 remove headliner and trim - simon, mwall
 +
* 04feb12 remove unused wiring - tyoung
 +
* 04feb12 remove freshwater hoses and corroded fittings - simon
 +
* 04feb12 remove riser and exhaust hose - mwall
 +
* 04feb12 clean deck, collect old parts - keith
 +
* 15jan12 eliminate rudder leaks - wfoster
 +
* ??oct11 shorten dinghy painter to 2 dinghy boat lengths
 +
* ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
 +
* ??oct11 install float switch on primary bilge pump
 
* 01oct11 Installed interior dogging handles on aft hatch - sbussolari
 
* 01oct11 Installed interior dogging handles on aft hatch - sbussolari
 
* 24sep11 installed dorade vents - stefie tellex
 
* 24sep11 installed dorade vents - stefie tellex

Revision as of 10:02, 5 February 2012

If a task is yours and you have additional information about it, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page if you disagree with the prioritization of any of these tasks.


Winter 2011/2012 Tasks

  • bilge - keith
    • remove old bilge hoses
    • rewire and re-plumb primary (diaphram) bilge pump
    • install secondary (submersible) bilge pump
    • re-plumb and rebuild/replace manual bilge pumps
  • septic system - sbussolari
    • replace septic system hoses
    • install holding tank
    • rebuild toilet
  • engine - mwall
    • replace engine exhaust
    • re-plumb engine cutoff
    • ensure oil catch
  • freshwater - simon
    • install new hoses
    • install new faucets in head/cabin
    • install saltwater pre-wash to galley sink
    • install new drain hoses
    • refurbish and install pump, accumulator, filter
  • rigging - wfoster
    • diagnose and repair cracks on deck around jib halyard block
  • prepare and paint bottom
  • replace traveler hardware
    • new traveler car
    • new end blocks
    • figure out better path for lines and cleats
  • plug 4 holes in rudder
  • replace zincs

Critical Tasks

  • create as-is freshwater schematic
  • create as-is 12v schematic
  • create as-is 110v schematic

High Priority Tasks

  • fabricate permanent oil catch-pan

Low Priority Tasks

Unprioritized Tasks

  • replace engine indicator panel plexiglass - tyoung
  • replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
  • patch hole above garmin chartplotter - tyoung
  • remount and seal garmin instruments - tyoung
  • tidy up electrical wiring in nav area - tyoung
  • repair dodger snaps
  • clean bilge completely of oil
  • repair and refinish wooden boarding ladder
  • return main sheet block to original position to eliminate coaming wear
  • lubricate frozen blocks at mast base
  • rebuild winches
  • replace boom vang tackle
  • bring cleaning supplies to boat and dock box
    • sponges
    • simple green
    • scrubbing brushes
    • broom and dustpan
    • paper towels
    • rags
    • 2 buckets
  • install forward hatch retainer for keeping hatch open
  • re-seat and de-humidify port and starboard compasses
  • repair engine compartment panels and hinges
  • fix nav station clock
  • replace electrical switch panels
  • replace nav station light with led
  • strip brightwork and apply cetol
  • new screws in lazarette latch hardware
  • pour new spartite
  • re-mount pulpit, back with g10?
  • replace glass in hatches - head and main cabin
  • replace fractured compass glass on pedestal
  • seal holes in cockpit
  • polish stainless steel pulpit and pushpit
  • fabricate covers for electrical outlets in port lazarette
  • create hangars for fenders in port lazarette

Completed Tasks

  • 04feb12 remove headliner and trim - simon, mwall
  • 04feb12 remove unused wiring - tyoung
  • 04feb12 remove freshwater hoses and corroded fittings - simon
  • 04feb12 remove riser and exhaust hose - mwall
  • 04feb12 clean deck, collect old parts - keith
  • 15jan12 eliminate rudder leaks - wfoster
  •  ??oct11 shorten dinghy painter to 2 dinghy boat lengths
  •  ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
  •  ??oct11 install float switch on primary bilge pump
  • 01oct11 Installed interior dogging handles on aft hatch - sbussolari
  • 24sep11 installed dorade vents - stefie tellex
  • 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
  • 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
  • 15sep11 create as-is septic schematic - ted
  • 11sep11 install security wire in dinghy - eric
  • 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
  • 11sep11 install winch holders in cockpit - mwall
  • 11sep11 install dodger to reduce water through coaming and companionway
  • 11sep11 install reefing line - thall
  • 11sep11 replace screws on lazarette latches - eric, simon
  • 11sep11 clean bilge - ksovie, bdeffenbaugh
  • 11sep11 install mast boot tape - mwall
  • 10sep11 install temporary oil catchpan
  • 10sep11 inventory of lines on board - kwinstein and stellex
  • 10sep11 septic diagram - kwinstein and stellex
  • 10sep11 re-rig lazy jack lines - mwall
  • 10sep11 tighten lifelines - sbussolari
  • 03sep11 Commission Dinghy and berth at Waterboat Marina - ted