Line 15: | Line 15: | ||
* fix and reinstall windex (ted) | * fix and reinstall windex (ted) | ||
* diagnose/fix and reinstall wind instruments (ted) | * diagnose/fix and reinstall wind instruments (ted) | ||
− | |||
* test VHF antenna and run new coax cable through the mast (ted) | * test VHF antenna and run new coax cable through the mast (ted) | ||
+ | * inspect top-of-mast furler, stays, swages, etc (ted, mwall) | ||
** as of 10may08, there is rusty patina on some stays, but no cracks or broken strands | ** as of 10may08, there is rusty patina on some stays, but no cracks or broken strands | ||
Revision as of 23:11, 15 May 2008
Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy.
Here is a map of Nevermore's Location: map of Nevermore location
If a task is yours and you have additional information about it, please make a page for that task, assign it to the Maintenance Tasks Category, and post updates.
Contents
Spring 2008 Tasks
before mast re-step
- replace mast light (ted)
- fix or replace the tricolor/anchor/strobe light fixture (ted)
- diagnose and reinstall RADAR antenna & wiring (ted)
- fix and reinstall windex (ted)
- diagnose/fix and reinstall wind instruments (ted)
- test VHF antenna and run new coax cable through the mast (ted)
- inspect top-of-mast furler, stays, swages, etc (ted, mwall)
- as of 10may08, there is rusty patina on some stays, but no cracks or broken strands
before re-float
- renew coast guard documentation (ted, fcharles)
- put the Certificate of Documentation aboard (ted)
- replace head thru-hull fittings (mwall)
- head output thruhull leaks inside the hull
- head input thruhull has de-laminated, neet to re-epoxy
- new depth sounder thruhull (ted)
- engine tune-up
- replace engine raw water inlet elbow with straight barb (ThomS)
- replace raw-water hose from separator to pump inlet (ThomS)
- run engine and check lube oil level and freshwater cooling level, and leaks (ThomS)
- Change transmission fluid (after launch, if necessary) (ThomS)
- install new depth sounder and sensor (ted, mwall)
- install bonding wire and ensure proper grounding (ted, mwall)
- plan established 10may08, with grounding to water using prop skeg
- prep and re-paint/touch-up hull (ablative paint) (mwall, others?)
- repaint name and hailing port on stern (ksovie)
- remove old name & hailing port using wet 500+ sandpaper, possibly acetone to help
- name is 'Nevermore', port is 'Boston'
- make arrangements for mooring through nov 2008 (mwall)
at re-float
- Re-rig centerboard pennant thru mast (during mast step) (WHO)
- (see Owner's Instructions pages 4-5, 5A, 14-15, 15A)
- (and TedY studied how to do it Fall '07, has emails, notes?)
- connect electric wires from mast
- top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax),
RADAR (n-wire cable), wind indicator (__?__ wires or cables?)
- top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax),
- Return loaned equipment to owners for winterizing
before general sailing
- Repair/upgrade traveller (See fix traveller page] (mwall, ksovie)
- measure buy and install new lines
- install new cam cleats inside of dodger
- install new bilge pump float switch (tyoung)
- new switch arrived and ready to be installed
- locate new switch aboard and store it in "new parts" plastic box
- Replace centerboard pennant (WHO)
- arrange with a boatyard for a post-splash "survey" haulout (e.g. over lunchtime) on TraveLift
- re-reave new line
- (see Owner's Instructions pages 4-5, 5A, 14-15, 15A)
- (and TedY studied how to do it Fall '07, has emails, notes?)
Tasks with a Point Person
- scan Fall '07 survey report (to put on wiki?) or just put aboard Nevermore? (fcharles)
- cushions (mwishear)
- cut new foam for cushions
- make new cushion covers
- diagnose and document electrical system (tspettel & tyoung)
- ongoing See 12-volt DC in Systems List, and Nav Station switch usages and wiring
- ongoing See 120-volt AC System in Systems List
- ongoing 110v charging system task description/discussion
- TODO: test the "blue-wire" charging-inhibition circuit which activates when engine runs
- TODO: write up operator steps for normal use
- procure new emergency and first-aid kit (asilveira)
- fix screens (tyoung)
- inventory what is on boat (samajane)
- engine periodic maintenance (not repairs) (ThomS)
- replace two engine pencil-zincs Fall/Winter '07/'08 (DONE)
- clean/replace fuel filters
- pick some other chores not done for winterizing, but are on webs ref'd in Winterizing page
- START a "periodic maintenance schedule (maybe based on [Aleida's] list we were mulling
- Install binnacle GPS power and data connectors (tyoung)
- replace missing screw on base of furler (tspettel)
- Fit & install support for aft lazarette shelf (above steering) and shelf under nav berth. Parts for these are already made, they just need a final fit/paint/install. Need 110V to shape the wood, I'll try to get it done before refloat. (dca)
- get binnacle compass bubble out
- remove compass and take to Fran at pavilion (DONE TedY)
- take to get it repaired (fcharles)
- replace freshwater hoses (mwall)
Cleaning Tasks
- clean kitchen again/more (samajane)
- ongoing see below
- clean/tune stove and oven (tyoung)
- main cabin
- scrub all wood surfaces with murphy's wood soap (diluted)
- scrub ceiling of main cabin
- starboard lazarette
- remove everything from lazarette then scrub it (use brushes), then put everything back when the lazarette has dried out
- aft lazarette
- remove everything from lazaretted (including wood panels) then scrub the hull and wood panels
- head
- remove everything from cupboards and scrub them out
- scrub all surfaces in the head
- holding tank needs to be drained then flushed a few times
- scrub the hull under the sink. beware of the outbound thru-hull fitting - it leaks already and we do not want to sink the boat by knocking it off or exacerbating the leak.
Unclaimed Tasks
- clean and lube winches
- outfit dinghy (boat, boards, motor)
- replace faulty head seals (NOTE: head tune-up kits are aboard)
- replace all head hoses
- install LED lighting (rcleary has some details of replacement parts)
- de-scale mast (in cabin)
- tighten lifelines
- sand and refinish topside brightwork (mwall has the cetol for this and the removable brightwork)
- secure nav light wiring in anchor compartment
- spec and order new speedometer
- wiring needs to be tidied up, specifically raised to be further from water levels
- bonding system of boat needs inspection/repair/upgrade
- diagnose, tune, and document radar/chartplotter system
- replace manual bilge pump (handle socket is fractured)
- install capture wires on anchor retention pin(s)
- fix blower and move its hose to bilge
- build shelves for storage under v-berth
- build slots for holding washboards
- supplement sides of starboard lazarette to prevent items from falling under engine
- add zippers or windows to bimini so you can see the sails.
Completed Tasks
- Remove winter cover (spring '08) (MWall, KennS, ThomS)
- pack it up neatly, and take it to Albany St. basement (building N4)
- key is at pavilion, on nail-in-wall just inside upstairs office/protest room
- fix bimini support to avoid traveler (ksovie)
- get boat surveyed (fcharles) - DONE - surveyed 04Dec
- get boat to boston :) (mlindblad, fcharles, asilveira, rcleary, smgarrel, mwall)
- remove unused stuff from boat (asilveira, rcleary, mwall)
- clean kitchen equipment (asilveira)
- procure freshwater pumps (rcleary)
- install freshwater pump (tyoung)
- lubricate door fittings (mwall)
- clean curtains (asilveira)
- 12v batteries and switches documented (tspettel)
- repair bilge pump and move to stern lazarette (tyoung)
- diagnose engine instruments (tspettel & tyoung)
- scrub inside of port cabin bench DONE (samajane/lfortmiller)
- scrub inside of port nav station compartment (beneath and to the left of the nav table) (samajane)
- scrub inner hull surfaces and vertical surfaces in the clothing cabinets (located near the head) (samajane/lfortmiller)
- repair faulty tachometer (tyoung)
- repair torn bimini (tyoung)
- scrub inside of freshwater tanks (samajane/tyoung/asilveira/rcleary)
- install new freshwater manual pump (twanderer)
- remove stove hoses and replace with new hoses (tyoung)
- purge stove fuel tank, clean, and reinstall (tyoung)
- install new shroud protection (mwall)
- procure life jackets (asilveira)
- sand down to fit, & revarnish, 3 saloon sole hatches (tspettel)
- scrub topsides to remove scuffs, epoxy, and mildew (and peanuts) (mwall)
- put line on steering wheel for grip and centering (mwall)
- blue one installed short-term. might install something more extensive later.
- scotchbrite topside stainless fittings (pulpit, stanchions, anchor tray) to remove rust (mwall)
- bilge
- after everything else has been cleaned, the bilge needs to be scrubbed with brushes and flushed numerous times (ksovie)
- replace fresh air intake cowl (dorade) on deck (ksovie)
- procure & change engine fluids: (doing as part of Winterizing '07/08) (DONE ThomS)
- fresh water coolant antifreeze - DONE - Nov07
- engine oil and filter - DONE - Nov07
-
transmission fluid(XFERRED to do befire general sailing list))