Difference between revisions of "Nevermore Task List"

From MITNA
Jump to: navigation, search
m (sole hatches varnished; refer 120-volt project to Sys List 1st-cut doc'n)
m (noted some leak stopped head outflow thru-hull)
Line 79: Line 79:
  
 
* diagnose (and replace?) head out thru-hull fitting (when boat is out of water)
 
* diagnose (and replace?) head out thru-hull fitting (when boat is out of water)
 +
:: tightened it mid-Sep, lots of leaking abated, some seepage still - ThomS
  
 
* install led lighting (rcleary has some details of replacement parts)
 
* install led lighting (rcleary has some details of replacement parts)

Revision as of 14:46, 5 October 2007

If a task is yours and you have additional information about it, please make a page for that task, assign it to the Maintenance Tasks Category, and post updates.

Tasks with a Point Person

  • renew coast guard documentation (fcharles)
  • outfit dinghy (boat, boards, motor) (sporter)
  • put line on steering wheel for grip and centering (mwall)
  • replace traveller line (mwall)
  • make new cushion covers (mwisheart)
  • fix screens (tyoung)
  • documentation of systems (samajane)
    • ongoing
  • install new bilge pump float switch (tyoung)
    • Franny says it's on order
  • diagnose and document electrical system (tspettel & tyoung)
    • ongoing
  • procure new emergency and first-aid kit (asilveira)
  • arrange for out-of-water winter storage (fcharles)
  • inventory what is on boat (samajane)
  • procure engine coolant (sporter)
  • change oil and coolant (sporter)
  • clean kitchen again/more (samajane)
    • ongoing see below
  • clean/tune stove and oven (tyoung)
  • Install GPS power and data connectors (tyoung)
  • replace freshwater hoses (mwall)


Cleaning Tasks

  • main cabin
    • scrub all wood surfaces with murphy's wood soap (diluted)
    • scrub ceiling of main cabin
  • starboard lazarette
    • remove everything from lazarette then scrub it (use brushes), then put everything back when the lazarette has dried out
  • aft lazarette
    • remove everything from lazaretted (including wood panels) then scrub the hull and wood panels
  • head
    • remove everything from cupboards and scrub them out
    • scrub all surfaces in the head
    • holding tank needs to be drained then flushed a few times
    • scrub the hull under the sink. beware of the outbound thru-hull fitting - it leaks already and we do not want to sink the boat by knocking it off or exacerbating the leak.
  • bilge
    • after everything else has been cleaned, the bilge needs to be scrubbed with brushes and flushed numerous times



Unclaimed Tasks

  • find a place to store her over the winter
  • replace faulty head seals
  • replace all head hoses
  • diagnose (and replace?) head out thru-hull fitting (when boat is out of water)
tightened it mid-Sep, lots of leaking abated, some seepage still - ThomS
  • install led lighting (rcleary has some details of replacement parts)
  • purge holding tank
  • de-scale mast (in cabin)
  • tune rigging
  • tighten lifelines
  • lubricate turnbuckles
  • replace sad ringdings
  • apply rigging tape to ringdings/cotter pins (after rig tuning and rd replace)
  • sand and refinish topside brightwork (mwall has the cetol for this)
  • secure nav light wiring in anchor compartment
  • install speedometer (The speedometer has disappeared)
  • fix wind indicator
  • wiring needs to be tidied up, specifically raised to be further from water levels
  • diagnose and tune depth indicator and sensor (dive under boat to clean?)
  • diagnose, tune, and document 12v system
  • diagnose, tune, and document 110v system
[see [Systems-List 3.3.2] 1st-cut documentation]
  • diagnose, tune, and document radar/chartplotter system
  • diagnose/change engine oil and oil filter
  • replace manual bilge pump (handle socket is fractured)
  • install capture wires on anchor retention pin(s)
  • fix blower and move its hose to bilge
  • build shelves for storage under v-berth
  • build shelf for storage under nav berth
  • build slots for holding washboards
  • supplement sides of starboard lazarette to prevent items from falling under engine
  • repaint name and hailing port on stern once our USCG documentation has been renewed.
  • add zippers or windows to bimini so you can see the sails.


Completed Tasks

  • get boat to boston :) (mlindblad, fcharles, asilveira, rcleary, smgarrel, mwall)
  • remove unused stuff from boat (asilveira, rcleary, mwall)
  • clean kitchen equipment (asilveira)
  • procure freshwater pumps (rcleary)
  • install freshwater pump (tyoung)
  • lubricate door fittings (mwall)
  • clean curtains (asilveira)
  • 12v batteries and switches documented (tspettel)
  • repair bilge pump and move to stern lazarette (tyoung)
  • diagnose engine instruments (tspettel & tyoung)
  • scrub inside of port cabin bench DONE (samajane/lfortmiller)
  • scrub inside of port nav station compartment (beneath and to the left of the nav table) DONE (samajane)
  • scrub inner hull surfaces and vertical surfaces in the clothing cabinets (located near the head) (samajane/lfortmiller)
  • repair faulty tachometer (tyoung)
  • repair torn bimini (tyoung)
  • scrub inside of freshwater tanks (samajane/tyoung/asilveira/rcleary)
  • install new freshwater manual pump (twanderer)
  • remove stove hoses and replace with new hoses (tyoung)
  • purge stove fuel tank, clean, and reinstall (tyoung)
  • install new shroud protection (mwall)
  • procure life jackets (asilveira)
  • sand down to fit, & revarnish, 3 saloon sole hatches: 3 sanded & fit (tspettel)