Difference between revisions of "Nevermore Trips"
From MITNA
Line 1: | Line 1: | ||
We do not yet have a formal scheduling system for Nevermore. | We do not yet have a formal scheduling system for Nevermore. | ||
− | She is not yet ready for trips, because there is a lot of [[maintenace]] to do. | + | She is not yet ready for trips, because there is a lot of <math>[[maintenace]]</math> to do. |
If you are scheduling a work day or will be at the boat, You can let us know here. | If you are scheduling a work day or will be at the boat, You can let us know here. | ||
Sometimes, the boat goes out for a "test sail" after work is completed ; ) | Sometimes, the boat goes out for a "test sail" after work is completed ; ) |
Revision as of 22:48, 3 September 2007
We do not yet have a formal scheduling system for Nevermore.
She is not yet ready for trips, because there is a lot of <math>maintenace</math> to do.
If you are scheduling a work day or will be at the boat, You can let us know here.
Sometimes, the boat goes out for a "test sail" after work is completed ; )