Difference between revisions of "Mashnee task list"
From MITNA
(→Summer 2022 Work) |
m (→Summer 2022 Work) |
||
Line 6: | Line 6: | ||
* Replace engine oil line that has nicks in it and a slow leak | * Replace engine oil line that has nicks in it and a slow leak | ||
− | * System for mounting radar and getting data to display | + | * System for mounting radar and getting data to display |
* Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail) | * Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail) | ||
− | * | + | * Repair hinges on lazarette hatch |
== Completed Tasks == | == Completed Tasks == | ||
* Repaired forward hatch hinges | * Repaired forward hatch hinges |
Revision as of 18:01, 28 July 2022
If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.
Please use the discussion page to discuss the prioritization and content of any of these tasks.
Summer 2022 Work
- Replace engine oil line that has nicks in it and a slow leak
- System for mounting radar and getting data to display
- Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
- Repair hinges on lazarette hatch
Completed Tasks
- Repaired forward hatch hinges