Difference between revisions of "Nevermore Task List"
From MITNA
(→Unclaimed Tasks) |
|||
Line 6: | Line 6: | ||
If a task is yours and you have additional information about it, please make a page for that task, assign it to the '''Maintenance Tasks Category''', and post updates. | If a task is yours and you have additional information about it, please make a page for that task, assign it to the '''Maintenance Tasks Category''', and post updates. | ||
− | == | + | == Spring 2008 Tasks == |
− | === TO DO | + | === TO DO before mast re-step === |
− | |||
− | |||
− | |||
* [[replace mast light (task)|replace mast light]] (mwall, asilveira) | * [[replace mast light (task)|replace mast light]] (mwall, asilveira) | ||
* [[fix mast toplight (task)| fix or replace the tricolor/anchor/strobe light fixture]] (ted) | * [[fix mast toplight (task)| fix or replace the tricolor/anchor/strobe light fixture]] (ted) | ||
Line 21: | Line 18: | ||
− | === TO DO | + | === TO DO before re-float === |
* renew coast guard documentation (ted, fcharles) | * renew coast guard documentation (ted, fcharles) | ||
** get Certif. of Doc. changed from "recreational" to "coastwise" endorsement (per [[http://www.cglicense.com/OUPVVesselEquipmentChecklist.pdf Grossetti]]) ('''''WHO?''''') | ** get Certif. of Doc. changed from "recreational" to "coastwise" endorsement (per [[http://www.cglicense.com/OUPVVesselEquipmentChecklist.pdf Grossetti]]) ('''''WHO?''''') | ||
Line 27: | Line 24: | ||
* [[replace head thru-hull fittings]] (mwall) | * [[replace head thru-hull fittings]] (mwall) | ||
− | ** head output thruhull leaks inside the hull | + | ** head output thruhull leaks inside the hull |
− | ** head input thruhull | + | ** head input thruhull has de-laminated, neet to re-epoxy |
− | + | ||
− | + | ||
− | + | ||
− | * run engine and check lube oil level and freshwater cooling level, and leaks (ThomS) | + | * engine tune-up |
+ | ** replace engine raw water inlet elbow with straight barb (ThomS) | ||
+ | ** run engine and check lube oil level and freshwater cooling level, and leaks (ThomS) | ||
+ | ** Change transmission fluid (after launch, if necessary) (ThomS) | ||
− | * | + | * install new depth sounder and sensor (ted, mwall for thru-hull) |
− | * | + | * install bonding wire and ensure proper grounding (ted, mwall) |
+ | ** plan established 10may08, with grounding to water using prop skeg | ||
− | === TO DO | + | * prep and re-paint/touch-up hull (ablative paint) |
+ | |||
+ | * repaint name and hailing port on stern once our USCG documentation has been renewed (ksovie) | ||
+ | |||
+ | |||
+ | === TO DO at re-float === | ||
* Re-rig centerboard pennant thru mast (during mast step) ('''''WHO''''') | * Re-rig centerboard pennant thru mast (during mast step) ('''''WHO''''') | ||
** (see [[Nevermore_Documents#T37_OI|Owner's Instructions]] pages 4-5, 5A, 14-15, 15A) | ** (see [[Nevermore_Documents#T37_OI|Owner's Instructions]] pages 4-5, 5A, 14-15, 15A) | ||
** (and TedY studied how to do it Fall '07, has emails, notes?) | ** (and TedY studied how to do it Fall '07, has emails, notes?) | ||
+ | |||
* connect electric wires from mast | * connect electric wires from mast | ||
** top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax), <br>RADAR (n-wire cable), wind indicator (__?__ wires or cables?) | ** top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax), <br>RADAR (n-wire cable), wind indicator (__?__ wires or cables?) | ||
Line 49: | Line 53: | ||
− | === TO DO | + | === TO DO before general sailing === |
* Repair/upgrade traveller (See [[fix traveller]] page] (mwall, ksovie) | * Repair/upgrade traveller (See [[fix traveller]] page] (mwall, ksovie) | ||
− | + | ** measure buy and install new lines | |
− | ** measure buy and install new lines | + | ** install new cam cleats inside of dodger |
+ | |||
* install new bilge pump float switch (tyoung) | * install new bilge pump float switch (tyoung) | ||
** new switch arrived and ready to be installed | ** new switch arrived and ready to be installed | ||
** locate new switch aboard and store it in "new parts" plastic box | ** locate new switch aboard and store it in "new parts" plastic box | ||
+ | |||
* Replace centerboard pennant ('''''WHO''''') | * Replace centerboard pennant ('''''WHO''''') | ||
** arrange with a boatyard for a post-splash "survey" haulout (e.g. over lunchtime) on TraveLift | ** arrange with a boatyard for a post-splash "survey" haulout (e.g. over lunchtime) on TraveLift | ||
Line 62: | Line 68: | ||
*** (see [[Nevermore_Documents#T37_OI|Owner's Instructions]] pages 4-5, 5A, 14-15, 15A) | *** (see [[Nevermore_Documents#T37_OI|Owner's Instructions]] pages 4-5, 5A, 14-15, 15A) | ||
*** (and TedY studied how to do it Fall '07, has emails, notes?) | *** (and TedY studied how to do it Fall '07, has emails, notes?) | ||
− | |||
− | |||
== Tasks with a Point Person == | == Tasks with a Point Person == | ||
* scan Fall '07 survey report (to put on wiki?) or just put aboard Nevermore? (fcharles) | * scan Fall '07 survey report (to put on wiki?) or just put aboard Nevermore? (fcharles) | ||
− | * cut new foam for cushions | + | |
− | * make new cushion covers | + | * cushions (mwishear) |
+ | ** cut new foam for cushions | ||
+ | ** make new cushion covers | ||
+ | |||
* diagnose and document electrical system (tspettel & tyoung) | * diagnose and document electrical system (tspettel & tyoung) | ||
** ongoing See [[Systems_Descriptions#12-volt DC | 12-volt DC]] in Systems List, and Nav Station switch [[nav_station_switches|usages]] and [[nav_station_switches_wiring|wiring]] | ** ongoing See [[Systems_Descriptions#12-volt DC | 12-volt DC]] in Systems List, and Nav Station switch [[nav_station_switches|usages]] and [[nav_station_switches_wiring|wiring]] | ||
Line 78: | Line 85: | ||
*** TODO: test the "blue-wire" charging-inhibition circuit which activates when engine runs | *** TODO: test the "blue-wire" charging-inhibition circuit which activates when engine runs | ||
*** TODO: write up operator steps for normal use | *** TODO: write up operator steps for normal use | ||
+ | |||
* procure new emergency and first-aid kit (asilveira) | * procure new emergency and first-aid kit (asilveira) | ||
+ | |||
* fix screens (tyoung) | * fix screens (tyoung) | ||
+ | |||
* inventory what is on boat (samajane) | * inventory what is on boat (samajane) | ||
+ | |||
* engine periodic maintenance (not repairs) (ThomS) | * engine periodic maintenance (not repairs) (ThomS) | ||
** replace two engine [[Systems_Descriptions#- - - - * sacrificial zincs in engine|pencil-zincs]] Fall/Winter '07/'08 (DONE) | ** replace two engine [[Systems_Descriptions#- - - - * sacrificial zincs in engine|pencil-zincs]] Fall/Winter '07/'08 (DONE) | ||
Line 99: | Line 110: | ||
* replace freshwater hoses (mwall) | * replace freshwater hoses (mwall) | ||
− | |||
== Cleaning Tasks == | == Cleaning Tasks == | ||
Line 126: | Line 136: | ||
== Unclaimed Tasks == | == Unclaimed Tasks == | ||
+ | |||
+ | * clean and lube winches | ||
* outfit dinghy (boat, boards, motor) | * outfit dinghy (boat, boards, motor) | ||
Line 164: | Line 176: | ||
* add zippers or windows to bimini so you can see the sails. | * add zippers or windows to bimini so you can see the sails. | ||
+ | |||
== Completed Tasks == | == Completed Tasks == | ||
+ | |||
+ | * Remove winter cover (spring '08) (MWall, KennS, ThomS) | ||
+ | ** pack it up neatly, and take it to Albany St. basement (building N4) | ||
+ | ** key is at pavilion, on nail-in-wall just inside upstairs office/protest room | ||
+ | |||
+ | * fix bimini support to avoid traveler (ksovie) | ||
* get boat surveyed (fcharles) - DONE - surveyed 04Dec | * get boat surveyed (fcharles) - DONE - surveyed 04Dec |
Revision as of 19:59, 11 May 2008
Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy.
Here is a map of Nevermore's Location: map of Nevermore location
If a task is yours and you have additional information about it, please make a page for that task, assign it to the Maintenance Tasks Category, and post updates.
Contents
Spring 2008 Tasks
TO DO before mast re-step
- replace mast light (mwall, asilveira)
- fix or replace the tricolor/anchor/strobe light fixture (ted)
- diagnose and reinstall RADAR antenna & wiring (ted)
- fix and reinstall windex (ted)
- diagnose/fix and reinstall wind instruments (ted)
- inspect top-of-mast furler, stays' swages, etc
TO DO before re-float
- renew coast guard documentation (ted, fcharles)
- get Certif. of Doc. changed from "recreational" to "coastwise" endorsement (per [Grossetti]) (WHO?)
- put the Certificate of Documentation aboard (ted)
- replace head thru-hull fittings (mwall)
- head output thruhull leaks inside the hull
- head input thruhull has de-laminated, neet to re-epoxy
- engine tune-up
- replace engine raw water inlet elbow with straight barb (ThomS)
- run engine and check lube oil level and freshwater cooling level, and leaks (ThomS)
- Change transmission fluid (after launch, if necessary) (ThomS)
- install new depth sounder and sensor (ted, mwall for thru-hull)
- install bonding wire and ensure proper grounding (ted, mwall)
- plan established 10may08, with grounding to water using prop skeg
- prep and re-paint/touch-up hull (ablative paint)
- repaint name and hailing port on stern once our USCG documentation has been renewed (ksovie)
TO DO at re-float
- Re-rig centerboard pennant thru mast (during mast step) (WHO)
- (see Owner's Instructions pages 4-5, 5A, 14-15, 15A)
- (and TedY studied how to do it Fall '07, has emails, notes?)
- connect electric wires from mast
- top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax),
RADAR (n-wire cable), wind indicator (__?__ wires or cables?)
- top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax),
- Return loaned equipment to owners for winterizing
TO DO before general sailing
- Repair/upgrade traveller (See fix traveller page] (mwall, ksovie)
- measure buy and install new lines
- install new cam cleats inside of dodger
- install new bilge pump float switch (tyoung)
- new switch arrived and ready to be installed
- locate new switch aboard and store it in "new parts" plastic box
- Replace centerboard pennant (WHO)
- arrange with a boatyard for a post-splash "survey" haulout (e.g. over lunchtime) on TraveLift
- re-reave new line
- (see Owner's Instructions pages 4-5, 5A, 14-15, 15A)
- (and TedY studied how to do it Fall '07, has emails, notes?)
Tasks with a Point Person
- scan Fall '07 survey report (to put on wiki?) or just put aboard Nevermore? (fcharles)
- cushions (mwishear)
- cut new foam for cushions
- make new cushion covers
- diagnose and document electrical system (tspettel & tyoung)
- ongoing See 12-volt DC in Systems List, and Nav Station switch usages and wiring
- ongoing See 120-volt AC System in Systems List
- ongoing 110v charging system task description/discussion
- TODO: test the "blue-wire" charging-inhibition circuit which activates when engine runs
- TODO: write up operator steps for normal use
- procure new emergency and first-aid kit (asilveira)
- fix screens (tyoung)
- inventory what is on boat (samajane)
- engine periodic maintenance (not repairs) (ThomS)
- replace two engine pencil-zincs Fall/Winter '07/'08 (DONE)
- clean/replace fuel filters
- pick some other chores not done for winterizing, but are on webs ref'd in Winterizing page
- START a "periodic maintenance schedule (maybe based on [Aleida's] list we were mulling
- Install binnacle GPS power and data connectors (tyoung)
- replace missing screw on base of furler (tspettel)
- Fit & install support for aft lazarette shelf (above steering) and shelf under nav berth. Parts for these are already made, they just need a final fit/paint/install. Need 110V to shape the wood, I'll try to get it done before refloat. (dca)
- get binnacle compass bubble out
- remove compass and take to Fran at pavilion (DONE TedY)
- take to get it repaired (fcharles)
- replace freshwater hoses (mwall)
Cleaning Tasks
- clean kitchen again/more (samajane)
- ongoing see below
- clean/tune stove and oven (tyoung)
- main cabin
- scrub all wood surfaces with murphy's wood soap (diluted)
- scrub ceiling of main cabin
- starboard lazarette
- remove everything from lazarette then scrub it (use brushes), then put everything back when the lazarette has dried out
- aft lazarette
- remove everything from lazaretted (including wood panels) then scrub the hull and wood panels
- head
- remove everything from cupboards and scrub them out
- scrub all surfaces in the head
- holding tank needs to be drained then flushed a few times
- scrub the hull under the sink. beware of the outbound thru-hull fitting - it leaks already and we do not want to sink the boat by knocking it off or exacerbating the leak.
Unclaimed Tasks
- clean and lube winches
- outfit dinghy (boat, boards, motor)
- replace faulty head seals (NOTE: head tune-up kits are aboard)
- replace all head hoses
- install LED lighting (rcleary has some details of replacement parts)
- de-scale mast (in cabin)
- tighten lifelines
- sand and refinish topside brightwork (mwall has the cetol for this and the removable brightwork)
- secure nav light wiring in anchor compartment
- spec and order new speedometer
- wiring needs to be tidied up, specifically raised to be further from water levels
- bonding system of boat needs inspection/repair/upgrade
- diagnose, tune, and document radar/chartplotter system
- replace manual bilge pump (handle socket is fractured)
- install capture wires on anchor retention pin(s)
- fix blower and move its hose to bilge
- build shelves for storage under v-berth
- build slots for holding washboards
- supplement sides of starboard lazarette to prevent items from falling under engine
- add zippers or windows to bimini so you can see the sails.
Completed Tasks
- Remove winter cover (spring '08) (MWall, KennS, ThomS)
- pack it up neatly, and take it to Albany St. basement (building N4)
- key is at pavilion, on nail-in-wall just inside upstairs office/protest room
- fix bimini support to avoid traveler (ksovie)
- get boat surveyed (fcharles) - DONE - surveyed 04Dec
- get boat to boston :) (mlindblad, fcharles, asilveira, rcleary, smgarrel, mwall)
- remove unused stuff from boat (asilveira, rcleary, mwall)
- clean kitchen equipment (asilveira)
- procure freshwater pumps (rcleary)
- install freshwater pump (tyoung)
- lubricate door fittings (mwall)
- clean curtains (asilveira)
- 12v batteries and switches documented (tspettel)
- repair bilge pump and move to stern lazarette (tyoung)
- diagnose engine instruments (tspettel & tyoung)
- scrub inside of port cabin bench DONE (samajane/lfortmiller)
- scrub inside of port nav station compartment (beneath and to the left of the nav table) (samajane)
- scrub inner hull surfaces and vertical surfaces in the clothing cabinets (located near the head) (samajane/lfortmiller)
- repair faulty tachometer (tyoung)
- repair torn bimini (tyoung)
- scrub inside of freshwater tanks (samajane/tyoung/asilveira/rcleary)
- install new freshwater manual pump (twanderer)
- remove stove hoses and replace with new hoses (tyoung)
- purge stove fuel tank, clean, and reinstall (tyoung)
- install new shroud protection (mwall)
- procure life jackets (asilveira)
- sand down to fit, & revarnish, 3 saloon sole hatches (tspettel)
- scrub topsides to remove scuffs, epoxy, and mildew (and peanuts) (mwall)
- put line on steering wheel for grip and centering (mwall)
- blue one installed short-term. might install something more extensive later.
- scotchbrite topside stainless fittings (pulpit, stanchions, anchor tray) to remove rust (mwall)
- bilge
- after everything else has been cleaned, the bilge needs to be scrubbed with brushes and flushed numerous times (ksovie)
- replace fresh air intake cowl (dorade) on deck (ksovie)
- procure & change engine fluids: (doing as part of Winterizing '07/08) (DONE ThomS)
- fresh water coolant antifreeze - DONE - Nov07
- engine oil and filter - DONE - Nov07
-
transmission fluid(XFERRED to do befire general sailing list))