== Tasks That Must Be Done First ==
 
== Tasks That Must Be Done First ==
  
* Move mast from aboard to on ground (Frannie to request boatyard)
+
* Move mast from aboard to on ground (Frannie requested boatyard c.14+16Nov)
 +
 
  
 
== Tasks That Must Be Done Soon (Before it Freezes) ==
 
== Tasks That Must Be Done Soon (Before it Freezes) ==
Line 13: Line 14:
 
** Drain and flush old antifreeze from cooling system and add fresh antifreeze
 
** Drain and flush old antifreeze from cooling system and add fresh antifreeze
 
** <strike>Drain salt-water from raw cooling system. and/or below</strike>
 
** <strike>Drain salt-water from raw cooling system. and/or below</strike>
** Add antifreeze to salt-water system/exhaust pot (bio-friendly)
+
** Add antifreeze to salt-water system/exhaust pot (bio-friendly) - DONE 16Nov ThomS
* Drain Freshwater tanks
+
* Freshwater cold/hot water system:
* Add non-toxic antifreeze to freshwater system.
+
** Drain 2 tanks - DONE 14Nov Thom - (BUT stbd tank 1/2 inch water left by hand-pump - see next item)
* Add non-toxic antifreeze to head/holding tank {{discuss}}
+
** Sponge out Stbd tank
 +
** <strike>Add non-toxic antifreeze to freshwater system</strike> (NOT REQ'D, piping (hoses) are all dissembled, tanks emptied)
 +
** Drain water from pump, filters, accumulator - ONLY PUMP DONE 16Nov ThomS (didn't look for other parts)
 +
** <strike>Drain water-heater</strike> if not adding antifreeze (NOT REQ'D, was drained when hosing removed earlier)
 +
* Add non-toxic antifreeze to head/holding tank - DONE c.14Nov - ThomS {{discuss}}
 
* Add antifreeze/rocksalt to bilge (or get the last few inches of water out) {{discuss}}
 
* Add antifreeze/rocksalt to bilge (or get the last few inches of water out) {{discuss}}
* Top up batteries' charges {{discuss}}
+
- - DONE TEMPORARY (antifreeze) 16Nov ThomS - (boat-cover not on yet, so expect more rain(?)water)
 +
* Top up batteries' water & charges {{discuss}}
  
 
== Other Tasks That Should Be Done Soon ==
 
== Other Tasks That Should Be Done Soon ==
  
 
* Install Winter Cover (needs mast moved to ground first) (crew)
 
* Install Winter Cover (needs mast moved to ground first) (crew)
** Buy recommended tape (3M #893 filament tape) - ORDERED 13Nov - ThomS
+
** Buy recommended tape (3M #893 filament tape) - RECEIVED 16Nov (at home) ThomS
 
-
 
-
 
* Equipment needing care at Pavilion:
 
* Equipment needing care at Pavilion:
Line 37: Line 43:
 
* Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
 
* Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
 
* Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
 
* Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
* Make sawhorses to store mast on - DONE 12-13Nov - Dave A, ThomS
+
* Make sawhorses to store mast on - DONE 12-13Nov - Dave A
  
  

Revision as of 09:33, 17 November 2007

Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location

Tasks That Must Be Done First

  • Move mast from aboard to on ground (Frannie requested boatyard c.14+16Nov)


Tasks That Must Be Done Soon (Before it Freezes)

  • Winterize engine (ThomS)
    • Change Engine Oil and Filter
    • Change Transmission Fluid
    • Fog Cylinders
    • Drain and flush old antifreeze from cooling system and add fresh antifreeze
    • Drain salt-water from raw cooling system. and/or below
    • Add antifreeze to salt-water system/exhaust pot (bio-friendly) - DONE 16Nov ThomS
  • Freshwater cold/hot water system:
    • Drain 2 tanks - DONE 14Nov Thom - (BUT stbd tank 1/2 inch water left by hand-pump - see next item)
    • Sponge out Stbd tank
    • Add non-toxic antifreeze to freshwater system (NOT REQ'D, piping (hoses) are all dissembled, tanks emptied)
    • Drain water from pump, filters, accumulator - ONLY PUMP DONE 16Nov ThomS (didn't look for other parts)
    • Drain water-heater if not adding antifreeze (NOT REQ'D, was drained when hosing removed earlier)
  • Add non-toxic antifreeze to head/holding tank - DONE c.14Nov - ThomS [discuss ]
  • Add antifreeze/rocksalt to bilge (or get the last few inches of water out) [discuss ]

- - DONE TEMPORARY (antifreeze) 16Nov ThomS - (boat-cover not on yet, so expect more rain(?)water)

Other Tasks That Should Be Done Soon

  • Install Winter Cover (needs mast moved to ground first) (crew)
    • Buy recommended tape (3M #893 filament tape) - RECEIVED 16Nov (at home) ThomS

-

  • Equipment needing care at Pavilion:
    • Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
    • Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)
    • Get mainsail washed and perform any necessary maintenance (Frannie)
    • Get Genoa Washed (Frannie) [discuss ]


Done Tasks

  • Lock up bow anchor - DONE 04Nov - ThomS
  • Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
  • Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
  • Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
  • Make sawhorses to store mast on - DONE 12-13Nov - Dave A


Equipment Borrowed from Sailors, to be returned after winterizing

  • Extension ladder (return after spring launch) - ThomS
  • Hose (c.20-feet section) - ThomS