Line 5: | Line 5: | ||
* Move mast from aboard to on ground (Frannie to request boatyard) | * Move mast from aboard to on ground (Frannie to request boatyard) | ||
− | == Tasks That Must Be Done Soon (Before | + | == Tasks That Must Be Done Soon (Before it Freezes) == |
* Winterize engine (ThomS) | * Winterize engine (ThomS) | ||
Line 12: | Line 12: | ||
** Fog Cylinders | ** Fog Cylinders | ||
** Drain and flush old antifreeze from cooling system and add fresh antifreeze | ** Drain and flush old antifreeze from cooling system and add fresh antifreeze | ||
− | ** Drain salt-water from raw cooling system. and/or below | + | ** <strike>Drain salt-water from raw cooling system. and/or below</strike> |
** Add antifreeze to salt-water system/exhaust pot (bio-friendly) | ** Add antifreeze to salt-water system/exhaust pot (bio-friendly) | ||
* Drain Freshwater tanks | * Drain Freshwater tanks | ||
Line 22: | Line 22: | ||
== Other Tasks That Should Be Done Soon == | == Other Tasks That Should Be Done Soon == | ||
− | |||
− | |||
* Install Winter Cover (needs mast moved to ground first) (crew) | * Install Winter Cover (needs mast moved to ground first) (crew) | ||
- | - | ||
− | * Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew) | + | * Tasks to be done at Pavilion: |
− | * Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew) | + | ** Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew) |
− | * Get mainsail washed and perform any necessary maintenance (Frannie) | + | ** Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew) |
− | * Get Genoa Washed (Frannie) {{discuss}} | + | ** Get mainsail washed and perform any necessary maintenance (Frannie) |
+ | ** Get Genoa Washed (Frannie) {{discuss}} | ||
+ | |||
== Done Tasks == | == Done Tasks == | ||
Line 35: | Line 35: | ||
* Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS | * Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS | ||
* Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS | * Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS | ||
+ | * Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov | ||
+ | * Make sawhorses to store mast on - DONE 12-13Nov - Dave A, ThomS | ||
== Equipment Borrowed from Sailors, to be returned after winterizing == | == Equipment Borrowed from Sailors, to be returned after winterizing == | ||
− | |||
* Extension ladder (return after spring launch) - ThomS | * Extension ladder (return after spring launch) - ThomS | ||
+ | * Hose (c.20-feet section) - ThomS | ||
== External Links == | == External Links == |
Revision as of 22:47, 13 November 2007
Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location
Contents
Tasks That Must Be Done First
- Move mast from aboard to on ground (Frannie to request boatyard)
Tasks That Must Be Done Soon (Before it Freezes)
- Winterize engine (ThomS)
- Change Engine Oil and Filter
- Change Transmission Fluid
- Fog Cylinders
- Drain and flush old antifreeze from cooling system and add fresh antifreeze
-
Drain salt-water from raw cooling system. and/or below - Add antifreeze to salt-water system/exhaust pot (bio-friendly)
- Drain Freshwater tanks
- Add non-toxic antifreeze to freshwater system.
- Add non-toxic antifreeze to head/holding tank [discuss ]
- Add antifreeze/rocksalt to bilge (or get the last few inches of water out) [discuss ]
- Top up batteries' charges [discuss ]
Other Tasks That Should Be Done Soon
- Install Winter Cover (needs mast moved to ground first) (crew)
-
- Tasks to be done at Pavilion:
- Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
- Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)
- Get mainsail washed and perform any necessary maintenance (Frannie)
- Get Genoa Washed (Frannie) [discuss ]
Done Tasks
- Lock up bow anchor - DONE 04Nov - ThomS
- Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
- Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
- Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
- Make sawhorses to store mast on - DONE 12-13Nov - Dave A, ThomS
Equipment Borrowed from Sailors, to be returned after winterizing
- Extension ladder (return after spring launch) - ThomS
- Hose (c.20-feet section) - ThomS