Difference between revisions of "Winterizing"

From MITNA
Jump to: navigation, search
(add bow-anchor, fix header tag)
Line 1: Line 1:
Here are tasks that need to be done to winterize the boat:
+
Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy:  See this [http://maps.google.com/maps?f=q&hl=en&geocode=&time=&date=&ttype=&q=42.244521,+-70.973058+(Nevermore+Location)&ie=UTF8&ll=42.244464,-70.97308&spn=0.002514,0.005305&t=h&z=18&iwloc=addr&om=1 map of her location]
  
== Before the Haul Date ==
+
== Tasks That Must Be Done First ==
  
* Fill Fuel Tank and Add Stabilizer (DONE Ted 10/21/2007)
+
* Acquire a ladder/chain/lock and lock ladder to boat stands
* Pump Out Head (DONE Ted 10/20/2007)
+
  
== Before the Trip to Quincy ==
+
== Tasks That Must Be Done Soon (Before It Freezes) ==
  
The mast will be pulled and the boat will be hauled at 2pm on Friday, Oct. 26 at Continental Marine in Quincy.  The following tasks need to be completed before the trip to Quincy. {{discuss}}
+
* Change Engine Oil and Filter (sporter says he will do this after the haulout)
 
+
* Remove mainsail, including furling lines. (DONE Ted/Thom 25Oct)
+
** TODO LATER: remove battens, furl neatly
+
** TODO LATER: get mainsail washed (and any maintenance?)
+
* Remove boom. (DONE Ted/Thom 25Oct)
+
* Remove genoa. (DONE Ted/Thom 25Oct)
+
** TODO LATER: furl neatly, find a sailbag)
+
* Check turnbuckles on shrouds & stays for corrosion. (DONE tspettel & ksovie 10/21/2007) (i.e. check that not seized)
+
* Disconnect electrical connections at base of mast. (DONE Ted 25Oct)
+
* Devise a system for raising the centerboard after the mast has been pulled (DONE 25Oct Ted/Thom) (2 methods)
+
 
+
== Immediately Before Hauling ==
+
 
+
Upon arrival at the boatyard, the following tasks need to be done before 2pm.
+
 
+
* Detach shrouds and stays from deck (DONE 26Oct Thom, yardworkers)
+
* Remove boot from mast step
+
 
+
== On the hard at Quincy - before continuing winterizing work ==
+
* Bring (borrow/buy):
+
** ladder/chain/lock
+
** electrical extension cord (c.100-foot)
+
** water hose (c.100-foot)
+
* Lock up bow anchor
+
 
+
== Before It Freezes ==
+
 
+
* Change Engine Oil and Filter (sporter will do this after the haulout)
+
 
* Change Transmission Fluid
 
* Change Transmission Fluid
 
* Drain coolant (seawater and antifreeze)
 
* Drain coolant (seawater and antifreeze)
Line 45: Line 16:
 
* Add antifreeze to salt-water system/exhaust pot (bio-friendly)
 
* Add antifreeze to salt-water system/exhaust pot (bio-friendly)
 
* Top up batteries' charges  
 
* Top up batteries' charges  
* -
+
 
 +
== Other Tasks That Should Be Done Soon ==
 +
 
 +
* Bring (borrow/buy):
 +
** electrical extension cord (c.300-foot)
 +
** water hose (c.150-foot)
 
* Bring up (from Conn.) and Install winter cover and its frame
 
* Bring up (from Conn.) and Install winter cover and its frame
 +
* Lock up bow anchor
 +
* Remove battens from mainsail & furl neatly
 +
* Get mainsail washed and perform any necessary maintenance
 +
* Furl Genoa neatly, find a sailbag

Revision as of 12:47, 31 October 2007

Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location

Tasks That Must Be Done First

  • Acquire a ladder/chain/lock and lock ladder to boat stands

Tasks That Must Be Done Soon (Before It Freezes)

  • Change Engine Oil and Filter (sporter says he will do this after the haulout)
  • Change Transmission Fluid
  • Drain coolant (seawater and antifreeze)
  • Fog Cylinders
  • Drain Freshwater tanks
  • Add non-toxic antifreeze to freshwater system.
  • Add non-toxic antifreeze to head/holding tank [discuss ]
  • Add antifreeze to salt-water system/exhaust pot (bio-friendly)
  • Top up batteries' charges

Other Tasks That Should Be Done Soon

  • Bring (borrow/buy):
    • electrical extension cord (c.300-foot)
    • water hose (c.150-foot)
  • Bring up (from Conn.) and Install winter cover and its frame
  • Lock up bow anchor
  • Remove battens from mainsail & furl neatly
  • Get mainsail washed and perform any necessary maintenance
  • Furl Genoa neatly, find a sailbag