Difference between revisions of "(by person)"

From MITNA
Jump to: navigation, search
(Eric:)
(Other:)
 
(7 intermediate revisions by one user not shown)
Line 3: Line 3:
 
==Greg:==
 
==Greg:==
 
* Repair keel - Greg. Greg has made good progress, Franny will push for him to complete the keel for launch.
 
* Repair keel - Greg. Greg has made good progress, Franny will push for him to complete the keel for launch.
* Paint bottom.
+
* Finish painting bottom.
* Take boom to boat. Greg is doing this.
+
* Work on outhaul on boom
Greg should provide guidance wrt bottom, mast/boom and topsides painting.
+
 
 +
==Adam:==
 +
* Repair dodger - Adam
 +
* Inflate red dinghy,  move to Waterboat.
 +
 
 +
==Ted:==
 +
* Inspect steering gear, grease rudderpost - Ted
 +
* Put batteries on boat
  
 
==Eric:==
 
==Eric:==
 
 
* Binnacle light - Eric (can be done after splash)
 
* Binnacle light - Eric (can be done after splash)
  
 
==Scott:==
 
==Scott:==
 
* Replace nuts on rear quarter fittings ( 3 to go ) - Scott
 
* Replace nuts on rear quarter fittings ( 3 to go ) - Scott
 
==Ted:==
 
* Replace damaged NMEA terminator for anemometer on masthead - Ted
 
* Inspect steering gear, grease rudderpost - Ted
 
* Condition batteries
 
 
==Adam:==
 
 
* Repair dodger - Adam
 
* Inflate red dinghy, coat with ArmorAll, move to Waterboat.
 
  
 
==Other:==
 
==Other:==
 
* Take cushions from pav to boat (shortly before launch)
 
* Take cushions from pav to boat (shortly before launch)
 +
* Clean tools (use vinegar and scotchbrite; then spray with WD40)
 +
* Clean S/S engine pan, and hull underneath

Latest revision as of 14:41, 30 March 2016

Edit to show progress...

Greg:

  • Repair keel - Greg. Greg has made good progress, Franny will push for him to complete the keel for launch.
  • Finish painting bottom.
  • Work on outhaul on boom

Adam:

  • Repair dodger - Adam
  • Inflate red dinghy, move to Waterboat.

Ted:

  • Inspect steering gear, grease rudderpost - Ted
  • Put batteries on boat

Eric:

  • Binnacle light - Eric (can be done after splash)

Scott:

  • Replace nuts on rear quarter fittings ( 3 to go ) - Scott

Other:

  • Take cushions from pav to boat (shortly before launch)
  • Clean tools (use vinegar and scotchbrite; then spray with WD40)
  • Clean S/S engine pan, and hull underneath