Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(MIT Work)
 
(34 intermediate revisions by 2 users not shown)
Line 2: Line 2:
  
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
= MIT Work =
 
* Attach hatch struts on bow and lazarette hatches
 
* Hand stitch the 95 Jib luff again
 
* Scrub bilges around engine with Dawn or Joy to remove fuel leak residue
 
* Put radar connector in more waterproof and secure location in lazarette locker
 
* Replace latch on dinghy bow hatch (new latch onboard Mashnee)
 
* Bungees on head hatch - Gavin
 
* Mounting for compass? New compass?
 
* Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
 
* Working jib - bolt rope on the luff frayed near the head - fix
 
* Stitch zipper stops for all sail bags
 
* Cunningham purchase system to easily be soft shackled on when needed - carabiner?
 
* Longer jib furling line to let us lead it aft? Soft shackle fairlead?
 
* Ring-dings for turnbuckles
 
* Replace eye for lee cloth on port berth
 
* Repair screen on the starboard porthole
 
* More permanent repair to companionway screen (+ better place to store)
 
* Add spreader patches to new 95 jib?
 
* Clean up wood around bilge panels for easier access
 
* Grease companionway tracks
 
* Spruce up soundproofing around the engine
 
* Enlarge spreader patches after repair on 160
 
* SOP + pictures of jackline setup
 
* Program new AIS MOB units and install
 
  
= Dion's Work =
+
==Sailing Season Projects==
 +
*Fix Running Lights
 +
*Cotter pins for shroud turnbuckles
  
*Get 1" half oval from Hamilton for Centerboard Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
+
==2024-25 Offseason work ==
* We need a new (3rd) cowl vent, one went missing at the start of the season. Dions
+
* to confirm: The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls
+
* Polish fuel tank- Boat should arrive with less than 1/3 tank
+
* Replace or repair two bent stanchions
+
  
= North Work =
+
===Projects from observations===
* We need a new canvas boot for the mast-deck connection.
+
*New mainsail cover
* Two little covers for furler line port.
+
*Patch or replace main hatch cover
 +
*New mast boot cover
 +
*Major dinghy repair or replacement
 +
*Re-affix hardware on main cabin skylight
 +
*Varnish the tiller
 +
*Replace the starboard bow light (is this separate from fixing it for the season?)
 +
*Consider the main halyard chafe--this will likely need replacement
 +
*Clean paddlewheel (speed sensor?)
 +
*Download B&G data
 +
*Messenger lines for halyards
  
 +
===Projected work based on routine intervals===
 +
*Inspect sails; make worklist
 +
*Inspect running rigging; make replacement list
 +
*Inspect standing rigging (us or Dions?); assess lifespan
 +
*Replace last two inflatable PFDs (2024 will be their 10th season)
 +
*Renew mast varnish
 +
*Winterize engine
 +
*Oil and filter change on engine
 +
*Change raw water impeller on engine
 +
*Winterize and clean fuel/fuel tank
 +
*Winterize and clean the head
 +
*Launder interior fabrics
 +
*Clean boat thoroughly
  
 +
==Completed Tasks==
 +
*Clean the dinghy motor propeller
  
= Budget for Next Year =
+
==Task Lists from Past Seasons==
* New jib sheets (60', 9/16 polyester double braid)
+
 
* New main sheet (three-strand works well)
+
2023-2024: [[Task_List_2023-24|here]]
* Replace last two inflatable PFDs (2024 will be their 10th season)
+
 
 +
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 22:28, 26 October 2024

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

  • Fix Running Lights
  • Cotter pins for shroud turnbuckles

2024-25 Offseason work

Projects from observations

  • New mainsail cover
  • Patch or replace main hatch cover
  • New mast boot cover
  • Major dinghy repair or replacement
  • Re-affix hardware on main cabin skylight
  • Varnish the tiller
  • Replace the starboard bow light (is this separate from fixing it for the season?)
  • Consider the main halyard chafe--this will likely need replacement
  • Clean paddlewheel (speed sensor?)
  • Download B&G data
  • Messenger lines for halyards

Projected work based on routine intervals

  • Inspect sails; make worklist
  • Inspect running rigging; make replacement list
  • Inspect standing rigging (us or Dions?); assess lifespan
  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Renew mast varnish
  • Winterize engine
  • Oil and filter change on engine
  • Change raw water impeller on engine
  • Winterize and clean fuel/fuel tank
  • Winterize and clean the head
  • Launder interior fabrics
  • Clean boat thoroughly

Completed Tasks

  • Clean the dinghy motor propeller

Task Lists from Past Seasons

2023-2024: here

2022-2023: here