= Dion's Work =
+
==Sailing Season Projects==
==Centerboard==
+
*Fix Running Lights
*Plan is to pull the board right away when hauled.
+
*Cotter pins for shroud turnbuckles
*Grind off head until it swings easily through wood on top of the lead keel while swelled up. Put the boat back into water to make certain it swings freely with the box wet and swollen up. Remove board again and glass up properly and install downhaul line up through the tube to the cabin top as well. New bright red paint.
+
*Get 1" half oval from Hamilton for Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
+
  
== Rigging, Hull, Motor ==  
+
==2024-25 Offseason work ==  
* Replace spreader lights - convert to LEDs with lower profile, mount them better. Dions
+
* We need a new (3rd) cowl vent, one went missing at the start of the season. Dions
+
* Inspect all standing rigging, grease Furlex bearings top and bottom
+
*  All the hatch hinges need to be strengthened, replaced and/or repaired. We had water intrusion and loss of almost all of them this year (I think it was time catching up to them?) Dions
+
* The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls Dions
+
* The whole inside of the hull needs to be gone over, especially in the cockpit lockers. There was significant mold/mildew buildup. (We did a first round in November. Dions in Spring?)
+
* Scrub bilges around engine with Dawn or Joy to remove fuel leak residue (we can also do this)
+
* Create a way to hold the lid under the forepeak berth open when rummaging for supplies. Dions
+
* Topsides touch-up again? Re-paint next year? Check plank ends at transom, please.
+
* Bottom paint, What brands are best? Sea Hawk?
+
* Varnish- Cabin top, toe rails, coamings, tiller, companionways, hatches, spars- Interior surfaces?
+
* Winterize engine and all water systems
+
* Motor- Change oil and filter. Leave spare filter on board
+
* Replace low-pressure engine oil line near on-engine fuel filter that has a nick and slow oil leak. It is getting worse. (+ reattach to prevent chafe; check other lines for potential chafe).
+
* Check forward starboard engine mount- seems off
+
* Polish fuel tank- Boat should arrive with less than 1/3 tank
+
* Purge water systems and flush/ bleach
+
* Fresh o rings and gaskets on fuel fill, fresh water fill and holding tank
+
* Flush and purge poop tank? Boat arrived mostly pumped out
+
* Replace or repair two bent stanchions
+
  
= North Work =
+
===Projects from observations===
* We need a new canvas boot for the mast-deck connection. North.
+
*New mainsail cover
* Two little covers for furler line port. North
+
*Patch or replace main hatch cover
* 140 work: Luff tape torn, need to buy a pre-feeder, Shorter aft batten along 140 foot
+
*New mast boot cover
* Big red spin- tear near clew repaired
+
*Major dinghy repair or replacement
* Mainsail cover inspected and repaired as needed
+
*Re-affix hardware on main cabin skylight
 +
*Varnish the tiller
 +
*Replace the starboard bow light (is this separate from fixing it for the season?)
 +
*Consider the main halyard chafe--this will likely need replacement
 +
*Clean paddlewheel (speed sensor?)
 +
*Download B&G data
 +
*Messenger lines for halyards
  
= Other outsource =  
+
===Projected work based on routine intervals===
*Code Zero - must work with current hardware. Sleeve - to fit cable.
+
*Inspect sails; make worklist
*New #3 jib?
+
*Inspect running rigging; make replacement list
* Second spinnaker halyard done properly - consistent in diameter
+
*Inspect standing rigging (us or Dions?); assess lifespan
* Replace dyneema topping lift?
+
*Replace last two inflatable PFDs (2024 will be their 10th season)
* New cable for spinnakers
+
*Renew mast varnish
 +
*Winterize engine
 +
*Oil and filter change on engine
 +
*Change raw water impeller on engine
 +
*Winterize and clean fuel/fuel tank
 +
*Winterize and clean the head
 +
*Launder interior fabrics
 +
*Clean boat thoroughly
  
= MIT Work =  
+
==Completed Tasks==
 +
*Clean the dinghy motor propeller
  
== Random Work ==
+
==Task Lists from Past Seasons==
  
* Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
+
2023-2024: [[Task_List_2023-24|here]]
* Bungees on head hatch - Gavin
+
* Mounting for compass? New compass?
+
  
== Sails==
+
2022-2023: [[Task_List_2022-23|here]]
 
+
* Working jib - bolt rope on the luff frayed near the head - fix
+
* Stitch zipper stops for all sail bags
+
 
+
==Rigging==
+
* Cunningham purchase system to easily be soft shackled on when needed - carabiner?
+
* Longer jib furling line to let us lead it aft? Soft shackle fairlead?
+
* Jib prefeeder - us
+
* Tack line hardware for attaching spin roller furler to a jamming bight - delay for now?
+
* Ring-dings for turnbuckles
+
* Replace all cotter pins
+
* Double smaller block for jib halyard. - Us
+
 
+
== Shopping List ==
+
 
+
==Miscellaneous==
+
* Handle to replace capstan? Get Fran a drawing - Gavin
+
* Figure out anti-fouling for the dinghy motor (doesn't tilt far enough up to keep prop out of water).
+
* Anti-foul the dinghy bottom
+
* Replace eye for lee cloth on port berth
+
* Repair screen on the starboard porthole
+
* More permanent repair to companionway screen (+ better place to store)
+
* Replace flag on end of windex triangle
+
 
+
* Clean up wood around bilge panels for easier access
+
* Grease companionway tracks
+
* Spruce up soundproofing around the engine
+
* Enlarge spreader patches after repair on 160
+
 
+
==Radar and electronics==
+
* Base for radar mount?
+
* Get a new MMSI and reprogram everything so we don't conflict with "FUSION" on the west coast? -- AIS MOB, VHF, etc.
+
 
+
== Electrical ==
+
* High water bilge alarm should be rewired to also pump; right now if the lower switch fails the high water alarm will go off but the pump won’t run - Ted
+
* Cabin lighting -- LED and red/white option (Dions)
+
* Electrical panel -- replace LED "power on indicator" for running lights - Ted
+
 
+
==Safety==
+
 
+
* Some safety provisions for short-handed and/or night time sailing?
+
* SOP + pictures of jackline setup
+
 
+
==Mechanical==
+
* Create a video of changing and seating washers and gaskets properly?
+
 
+
== Spring (Pre-Launch) Tasks ==
+
* Rearm PFDs & Re-attach MOB AIS units to marker PFDs - Done
+
* Inventory + restock med kit - Done
+
* Go over whole hull for mold/mildew - Done
+
* Sails to move on in spring
+
** 140
+
** 160
+
** New 105
+
** Main
+
** New code 0
+
** Big red
+
 
+
== Completed Tasks ==
+
* Re-rig reefing hook to sit closer to the boom -  Part is in the liquor locker drawers with a shackle on it.
+
* Wipe down all surfaces to reduce mold/mildew. (Used a mild bleach solution followed by freshwater wipe-down)
+
* Scrub overhead above refrigerator to remove mildew
+
* Remove PFDs, lines, [and all other moveable gear not needed by Dions to Bay 4 of the sailing pavilion]
+
* Remove all cutlery, plates, pots, etc.
+
* Inspected mainsail, working jib, 135 and 160 [11 Nov. 2022]
+
* Manually inflate + inspect all PFDs [2 Dec. 2022]
+
* Housing for the radar reflector (bag)
+
* All the dinghy glue [8 April 2023]
+
* Review all tools and service/replace any that are necessary and broken/too rusty [8 April 2023 - Zach]
+
* Whipped old jib sheet ends  (Original task: Replace jib sheet - same diameter, length + 1' - maybe just fix?)
+
* End for ended the main sheet. [6 May 2023]
+
* Winch handle release issue -- repaired/replace mechanism [5 May 2023]
+
 
+
== Completed Procurement ==
+
* Purchase 5 new tethers: https://pro.westmarine.com/west-marine-orc-specification-double-safety-tether-11878691.html
+
* Purchase a new flag for the flagpole: dimensions are: 52” x28.5”
+
* Purchase one new throwable light for 3rd throwable: https://pro.westmarine.com/acr-electronics-hemilight3-hl3-18029827.html
+
* Pylon lights for PFDs (2): https://www.landfallnavigation.com/spinlock-pylon-lifejacket-light.html?
+
* Marpol placards: https://pro.westmarine.com/west-marine-required-waste-oil-garbage-placards-8788986.html
+
* Purchase Extra racor filters - R12P in 10 micron (2) and 30 micron (2) - check current inventory
+
* Procure a few extra emergency bungs: https://pro.westmarine.com/seafit-wooden-emergency-bungs-plugs-4641080.html
+
* Procure a pool noodle (or something else) for storing the battens
+
* LOOS gauge
+
* A third set of foam PFDs so we can have more than 8 people onboard legally : https://pro.westmarine.com/west-marine-type-ii-buoyant-life-jacket-four-pack-adult-over-90lb.-595134.html
+
* Night use distress light:  https://pro.westmarine.com/orion-floating-locator-electronic-sos-beacon-kit-18460139.html
+
* CO detector: https://www.westmarine.com/fireboy-xintex-battery-operated-marine-carbon-monoxide-detector-18771691.html
+
* Purchase 3 new rearm kits: https://pro.westmarine.com/spinlock-deckvest-life-jacket-rearming-kit-automatic-33-g.-1-2inch-threaded-9133075.html
+
 
+
== Budget for Next Year ==
+
* New jib sheets (60', 9/16 polyester double braid)
+
* New main sheet (three-strand works well)
+
* Replace last two inflatable PFDs (2024 will be their 10th season)
+

Latest revision as of 22:28, 26 October 2024

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

  • Fix Running Lights
  • Cotter pins for shroud turnbuckles

2024-25 Offseason work

Projects from observations

  • New mainsail cover
  • Patch or replace main hatch cover
  • New mast boot cover
  • Major dinghy repair or replacement
  • Re-affix hardware on main cabin skylight
  • Varnish the tiller
  • Replace the starboard bow light (is this separate from fixing it for the season?)
  • Consider the main halyard chafe--this will likely need replacement
  • Clean paddlewheel (speed sensor?)
  • Download B&G data
  • Messenger lines for halyards

Projected work based on routine intervals

  • Inspect sails; make worklist
  • Inspect running rigging; make replacement list
  • Inspect standing rigging (us or Dions?); assess lifespan
  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Renew mast varnish
  • Winterize engine
  • Oil and filter change on engine
  • Change raw water impeller on engine
  • Winterize and clean fuel/fuel tank
  • Winterize and clean the head
  • Launder interior fabrics
  • Clean boat thoroughly

Completed Tasks

  • Clean the dinghy motor propeller

Task Lists from Past Seasons

2023-2024: here

2022-2023: here