Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(Shopping List)
 
(85 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
== Pre-storage (fall) tasks ==  
+
==Sailing Season Projects==
* Lay out all sails and look for any issues
+
*Fix Running Lights
* Dry the spare lines, spinnakers, and anything else that’s wet, especially if they will be stored somewhere without air circulation
+
*Cotter pins for shroud turnbuckles
* Inspect all lines, rig hardware, and spars before storing them for the winter
+
* Inspect and inventory safety gear, medical kit, etc.
+
* Inventory spare parts and make list of needed replacements
+
* Scrub bilges around engine with Joy to remove fuel leak residue
+
* Remove knives -- Gavin to resharpen
+
  
Organize bins:
+
==2024-25 Offseason work ==
* Kitchen stuff
+
* Foulies
+
* PFDs + tethers
+
* Books / charts / nav equipment + medical kits + safety equipment
+
* Cleaning supplies
+
* Lines
+
* Spares from under the forward berth
+
  
= Dion's Work =
+
===Projects from observations===
==Centerboard==
+
*New mainsail cover
*Plan is to pull the board right away when hauled.
+
*Patch or replace main hatch cover
*Grind off head until it swings easily through wood on top of the lead keel while swelled up. Put the boat back into water to make certain it swings freely with the box wet and swollen up. Remove board again and glass up properly and install downhaul line up through the tube to the cabin top as well. New bright red paint.
+
*New mast boot cover
*Get 1" half oval from Hamilton for Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
+
*Major dinghy repair or replacement
 +
*Re-affix hardware on main cabin skylight
 +
*Varnish the tiller
 +
*Replace the starboard bow light (is this separate from fixing it for the season?)
 +
*Consider the main halyard chafe--this will likely need replacement
 +
*Clean paddlewheel (speed sensor?)
 +
*Download B&G data
 +
*Messenger lines for halyards
  
== Rigging, Hull, Motor ==  
+
===Projected work based on routine intervals===
* Replace spreader lights - convert to LEDs with lower profile, mount them better. Dions
+
*Inspect sails; make worklist
* We need a new (3rd) cowl vent, one went missing at the start of the season. Dions
+
*Inspect running rigging; make replacement list
* Inspect all standing rigging, grease Furlex bearings top and bottom
+
*Inspect standing rigging (us or Dions?); assess lifespan
*  All the hatch hinges need to be strengthened, replaced and/or repaired. We had water intrusion and loss of almost all of them this year (I think it was time catching up to them?) Dions
+
*Replace last two inflatable PFDs (2024 will be their 10th season)
* The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls Dions
+
*Renew mast varnish
* The whole inside of the hull needs to be gone over, especially in the cockpit lockers. There was significant mold/mildew buildup. (We did a first round in November. Dions in Spring?)
+
*Winterize engine
* Scrub bilges around engine with Dawn or Joy to remove fuel leak residue (we can also do this)
+
*Oil and filter change on engine
* Create a way to hold the lid under the forepeak berth open when rummaging for supplies. Dions
+
*Change raw water impeller on engine  
* Topsides touch-up again? Re-paint next year? Check plank ends at transom, please.
+
*Winterize and clean fuel/fuel tank
* Bottom paint, What brands are best? Sea Hawk?
+
*Winterize and clean the head
* Varnish- Cabin top, toe rails, coamings, tiller, companionways, hatches, spars- Interior surfaces?
+
*Launder interior fabrics
* Winterize engine and all water systems
+
*Clean boat thoroughly
* Motor- Change oil and filter. Leave spare filter on board
+
* Replace low-pressure engine oil line near on-engine fuel filter that has a nick and slow oil leak. It is getting worse. (+ reattach to prevent chafe; check other lines for potential chafe).
+
* Check forward starboard engine mount- seems off
+
* Polish fuel tank- Boat should arrive with less than 1/3 tank
+
* Purge water systems and flush/ bleach
+
* Fresh o rings and gaskets on fuel fill, fresh water fill and holding tank
+
* Flush and purge poop tank? Boat arrived mostly pumped out
+
* Replace or repair two bent stanchions
+
  
= North Work =
+
==Completed Tasks==
* We need a new canvas boot for the mast-deck connection. North.
+
*Clean the dinghy motor propeller
* Two little covers for furler line port. North
+
* 140 work: Luff tape torn, need to buy a pre-feeder, Shorter aft batten along 140 foot
+
* Big red spin- tear near clew repaired
+
* Mainsail cover inspected and repaired as needed
+
  
= Other outsource =  
+
==Task Lists from Past Seasons==
*Code Zero - must work with current hardware. Sleeve - to fit cable.
+
*New #3 jib?
+
* Second spinnaker halyard done properly - consistent in diameter
+
* Replace dyneema topping lift?
+
* New cable for spinnakers
+
  
= MIT Work =
+
2023-2024: [[Task_List_2023-24|here]]
  
== Random Work ==
+
2022-2023: [[Task_List_2022-23|here]]
 
+
* Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
+
* Bungees on head hatch - Gavin
+
* Mounting for compass? New compass?
+
 
+
== Sails==
+
 
+
* Working jib - bolt rope on the luff frayed near the head - maybe not needed if replacing?
+
* Stitch zipper stops for all sail bags
+
 
+
==Rigging==
+
* Replace jib sheet - same diameter, length + 1' - maybe just fix?
+
* Whipped jib sheet ends
+
* Replace or end for end the main sheet
+
* Cunningham purchase system to easily be soft shackled on when needed - carabiner?
+
* Longer jib furling line to let us lead it aft? Soft shackle fairlead?
+
* Winches broken down and greased - Gavin
+
* Jib prefeeder - us
+
* Tack line hardware for attaching spin roller furler to a jamming bight - delay for now?
+
* Ring-dings for turnbuckles
+
* Replace all cotter pins
+
* Double smaller block for jib halyard. - Us
+
 
+
== Shopping List ==
+
* Purchase 5 new tethers: https://pro.westmarine.com/west-marine-orc-specification-double-safety-tether-11878691.html
+
* Purchase 3 new rearm kits: https://pro.westmarine.com/spinlock-deckvest-life-jacket-rearming-kit-automatic-33-g.-1-2inch-threaded-9133075.html
+
* Purchase a new flag for the flagpole: dimensions are: 52” x28.5”
+
* Purchase one new throwable light for 3rd throwable: https://pro.westmarine.com/acr-electronics-hemilight3-hl3-18029827.html
+
* Pylon lights for PFDs (2): https://www.landfallnavigation.com/spinlock-pylon-lifejacket-light.html?gclid=CjwKCAiAhKycBhAQEiwAgf19eriJIPZmnIyohJ4ipXv4pXM4d6Ols0UmGmQoVR_pq0HYBtSBTLtYlxoCsuwQAvD_BwE
+
* purchase some of those blue grippy gloves or similar for the boat to have for people to use
+
* Purchase more sail ties that are extra-long -- webbing -- Fran
+
* Procure more hand sanitizer for onboard use
+
* Procure 8 wood hangers for the foulies
+
* Procure origo dometic 3000 rubber gasket for top of fuel container - https://www.atlanticmarinesupply.com/product/dometic-environmental-3880036-00-rubber-gasket/
+
* Procure 4 more mugs for onboard use: whatever is cheaper: https://pro.westmarine.com/yeti-10-oz.-rambler-mug-with-magslider-lid-P020351821.html or https://rticoutdoors.com/Coffee-Mug
+
* Procure a metric socket set for onboard tasks (e.g. engine work)
+
* Procure some chamois for proper clean-up
+
* Procure a pool noodle (or something else) for storing the battens
+
* Purchase new self-sealing washer for fuel stop solenoid and replace: Volvo Part 21424327
+
* Purchase Extra racor filters - R12P in 10 micron (2) and 30 micron (2) - check current inventory
+
* Procure 2 pairs of safety glasses for the tool kit
+
 
+
==Miscellaneous==
+
* Handle to replace capstan? Get Fran a drawing - Gavin
+
* Housing for the radar reflector—a bag or permanent hook or both - Libby
+
* Figure out anti-fouling for the dinghy motor (doesn't tilt far enough up to keep prop out of water).
+
* Anti-foul the dinghy bottom
+
* All the dinghy glue
+
* Replace eye for lee cloth on port berth
+
* Repair screen on the starboard porthole
+
* More permanent repair to companionway screen (+ better place to store)
+
* Replace flag on end of windex triangle
+
* Winch handle release issue -- can we fix this?
+
* Shave bilge panels for easier access?
+
* Grease companionway tracks
+
* Spruce up soundproofing around the engine
+
* Enlarge spreader patches after repair on 160
+
 
+
==Radar and electronics==
+
* Base for radar mount?
+
* Full electronics meeting to follow. Radar/new MFD, etc? Both B&G and Raymarine reps just recommended getting a new raymarine radar. To replace the MFD we’d also need to replace a lot of the sensors around the boat.
+
* New Raymarine radar so that we can it to display on the chart plotter?
+
* Get rid of gremlins in the wireless displays (voltage boost?)
+
* Get touchscreen physical buttons properly working
+
* Get a new MMSI and reprogram everything so we don't conflict with "FUSION" on the west coast? -- AIS MOB, VHF, etc.
+
* Engine panel electrical gremlins - clean and reseat all contacts…
+
* Neaten up wiring to the chartplotter so that the "T" lives inside the cabinet
+
* Expedition software? If so, need a windows PC setup...
+
 
+
== Electrical ==
+
* High water bilge alarm should be rewired to also pump; right now if the lower switch fails the high water alarm will go off but the pump won’t run - Ted
+
* Cabin lighting -- LED and red/white option?
+
* Electrical panel -- replace LED "power on indicator" for running lights
+
 
+
==Safety==
+
 
+
* Some safety provisions for short-handed and/or night time sailing?
+
* SOP + pictures of jackline setup
+
* Encourage all to take a Safety at Sea seminar this winter.
+
* Procure 3 re-arm kits for PFDs - on order list
+
* Procure an 3rd water-activated light for 3rd throwable - on order list
+
 
+
==Mechanical==
+
* Create a video of changing and seating washers and gaskets properly?
+
 
+
== Spring (Pre-Launch) Tasks ==
+
 
+
* Inventory + restock med kit
+
* Go over whole hull for mold/mildew
+
* Review all tools and service/replace any that are necessary and broken/too rusty
+
* Sails to move on in spring
+
** 140
+
** 160
+
** New 105
+
** Main
+
** New code 0
+
** Big red
+
 
+
==Next summer==
+
*Training sessions
+
* Skipper dry run for jacklines + MOB
+
 
+
== Completed Tasks ==
+
* Re-rig reefing hook to sit closer to the boom -  Part is in the liquor locker drawers with a shackle on it.
+
* Wipe down all surfaces to reduce mold/mildew. (Used a mild bleach solution followed by freshwater wipe-down)
+
* Scrub overhead above refrigerator to remove mildew
+
* Remove PFDs, lines, [and all other moveable gear not needed by Dions to Bay 4 of the sailing pavilion]
+
* Remove all cutlery, plates, pots, etc.
+
* Inspected mainsail, working jib, 135 and 160 [11 Nov. 2022]
+
* Manually inflate + inspect all PFDs [2 Dec. 2022]
+

Latest revision as of 22:28, 26 October 2024

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

  • Fix Running Lights
  • Cotter pins for shroud turnbuckles

2024-25 Offseason work

Projects from observations

  • New mainsail cover
  • Patch or replace main hatch cover
  • New mast boot cover
  • Major dinghy repair or replacement
  • Re-affix hardware on main cabin skylight
  • Varnish the tiller
  • Replace the starboard bow light (is this separate from fixing it for the season?)
  • Consider the main halyard chafe--this will likely need replacement
  • Clean paddlewheel (speed sensor?)
  • Download B&G data
  • Messenger lines for halyards

Projected work based on routine intervals

  • Inspect sails; make worklist
  • Inspect running rigging; make replacement list
  • Inspect standing rigging (us or Dions?); assess lifespan
  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Renew mast varnish
  • Winterize engine
  • Oil and filter change on engine
  • Change raw water impeller on engine
  • Winterize and clean fuel/fuel tank
  • Winterize and clean the head
  • Launder interior fabrics
  • Clean boat thoroughly

Completed Tasks

  • Clean the dinghy motor propeller

Task Lists from Past Seasons

2023-2024: here

2022-2023: here