Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(Task Lists from Past Seasons)
Line 3: Line 3:
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
 +
==Sailing Season Projects==
 +
*Fix Running Lights
 +
*Cotter pins for shroud turnbuckles
  
=2023-2024 offseason work =  
+
==2024-25 Offseason work ==  
  
Note: Most items on this list are based on post-haul out observations, which are listed on the discussion page.
+
===Projects from observations==
 +
*New mainsail cover
 +
*Patch or replace main hatch cover
 +
*New mast boot cover
 +
*Major dinghy repair or replacement
  
== Inspections (items probably outside MIT knowledge base)==
+
===Projected work based on routine intervals===
* Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
+
*Replace last two inflatable PFDs (2024 will be their 10th season)
* Deck joints around chainplates
+
*Renew mast varnish
* Mast just under the forestay tang for incipient rot
+
*Engine: oil change, new impeller.  Polish fuel tank?
* Cutlass bearings
+
  
== Maintenance/Renewals ==
 
* Varnish mast
 
* Varnish bowsprit
 
* Varnish cockpit coamings
 
* Clean propeller
 
* Winterize engine, freshwater system, and blackwater
 
* Change fuel filters and impeller
 
  
== Repairs ==
+
==Completed Tasks==
* Cabin hatch top
+
* Shave edges from weatherboards to alleviate sticking and jamming
+
* Repair porthole screens; clean gaskets and threads around portholes
+
* Fill holes on lazarette and bow hatch strut attachment and re-install
+
* Shorten reefing hook
+
  
* Sail repairs: tears in 140 and 95 jibs; mainsail
 
  
== Gear Replacements ==
+
==Task Lists from Past Seasons==
* New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [https://www.neropes.com/products/traditional-rigging/product/detail/spun-classic/])
+
* New jib sheets (60', 9/16 polyester double braid)
+
* New topping lift
+
* New mast boot
+
 
+
== New Work ==
+
* SOP + pictures of jackline setup
+
 
+
= Budget for Next Year =
+
* Replace last two inflatable PFDs (2024 will be their 10th season)
+
 
+
 
+
== Completed Tasks ==
+
 
+
 
+
= Task Lists from Past Seasons =
+
  
 
2023-2024: [[Task_List_2023-24|here]]
 
2023-2024: [[Task_List_2023-24|here]]
  
 
2022-2023: [[Task_List_2022-23|here]]
 
2022-2023: [[Task_List_2022-23|here]]

Revision as of 20:47, 20 September 2024

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

  • Fix Running Lights
  • Cotter pins for shroud turnbuckles

2024-25 Offseason work

=Projects from observations

  • New mainsail cover
  • Patch or replace main hatch cover
  • New mast boot cover
  • Major dinghy repair or replacement

Projected work based on routine intervals

  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Renew mast varnish
  • Engine: oil change, new impeller. Polish fuel tank?


Completed Tasks

Task Lists from Past Seasons

2023-2024: here

2022-2023: here