Difference between revisions of "Task List 2023-24"

From MITNA
Jump to: navigation, search
(Created page with "2023-2024 offseason work Note: Most items on this list are based on post-haul out observations, which are listed on the discussion page. Inspections (items probably outside ...")
 
(2023-2024 offseason work)
 
(3 intermediate revisions by one user not shown)
Line 1: Line 1:
2023-2024 offseason work
 
  
Note: Most items on this list are based on post-haul out observations, which are listed on the discussion page.
+
== 2023-2024 offseason work ==
 +
Note: most items on this list are based on post-haul out observations, which are listed on the discussion page.
 +
The current task list is [[Task_List|here]]
  
Inspections (items probably outside MIT knowledge base)
+
== Inspections (items probably outside MIT knowledge base) ==
 +
*Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
 +
*Deck joints around chainplates
 +
*Mast just under the forestay tang for incipient rot
 +
*Cutlass bearings
  
Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
+
==Maintenance/Renewals==
Deck joints around chainplates
+
*Varnish mast
Mast just under the forestay tang for incipient rot
+
*Varnish bowsprit
Cutlass bearings
+
*Varnish cockpit coamings
Maintenance/Renewals
+
*Clean propeller
 +
*Winterize engine, freshwater system, and blackwater
 +
*Change fuel filters and impeller
  
Varnish mast
+
==Repairs==
Varnish bowsprit
+
*Cabin hatch top
Varnish cockpit coamings
+
*Shave edges from weatherboards to alleviate sticking and jamming
Clean propeller
+
*Repair porthole screens; clean gaskets and threads around portholes
Winterize engine, freshwater system, and blackwater
+
*Fill holes on lazarette and bow hatch strut attachment and re-install
Change fuel filters and impeller
+
*Shorten reefing hook
Repairs
+
*Sail repairs: tears in 140 and 95 jibs; mainsail
  
Cabin hatch top
+
==Gear Replacements==
Shave edges from weatherboards to alleviate sticking and jamming
+
*New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [1])
Repair porthole screens; clean gaskets and threads around portholes
+
*New jib sheets (60', 9/16 polyester double braid)
Fill holes on lazarette and bow hatch strut attachment and re-install
+
*New topping lift
Shorten reefing hook
+
*New mast boot
Sail repairs: tears in 140 and 95 jibs; mainsail
+
Gear Replacements
+
  
New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [1])
+
==New Work==
New jib sheets (60', 9/16 polyester double braid)
+
*SOP + pictures of jackline setup
New topping lift
+
New mast boot
+
New Work
+
  
SOP + pictures of jackline setup
+
==Budget for Next Year==
Budget for Next Year
+
  
Replace last two inflatable PFDs (2024 will be their 10th season)
+
*Replace last two inflatable PFDs (2024 will be their 10th season)

Latest revision as of 20:40, 20 September 2024

2023-2024 offseason work

Note: most items on this list are based on post-haul out observations, which are listed on the discussion page. The current task list is here

Inspections (items probably outside MIT knowledge base)

  • Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
  • Deck joints around chainplates
  • Mast just under the forestay tang for incipient rot
  • Cutlass bearings

Maintenance/Renewals

  • Varnish mast
  • Varnish bowsprit
  • Varnish cockpit coamings
  • Clean propeller
  • Winterize engine, freshwater system, and blackwater
  • Change fuel filters and impeller

Repairs

  • Cabin hatch top
  • Shave edges from weatherboards to alleviate sticking and jamming
  • Repair porthole screens; clean gaskets and threads around portholes
  • Fill holes on lazarette and bow hatch strut attachment and re-install
  • Shorten reefing hook
  • Sail repairs: tears in 140 and 95 jibs; mainsail

Gear Replacements

  • New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [1])
  • New jib sheets (60', 9/16 polyester double braid)
  • New topping lift
  • New mast boot

New Work

  • SOP + pictures of jackline setup

Budget for Next Year

  • Replace last two inflatable PFDs (2024 will be their 10th season)