Difference between revisions of "X-Dimension task list"
From MITNA
(→Pre-splash 2016 Tasklist (the big things and then some)) |
|||
(28 intermediate revisions by 3 users not shown) | |||
Line 4: | Line 4: | ||
− | == Pre-splash | + | == Pre-2017 splash work == |
− | * | + | |
− | * | + | * Clean the bottom. Maybe paint the bottom. The bottom will change color in August, so there’s no need to put two coats of black on, or maybe even get new black bottom paint. |
− | * | + | |
− | * | + | * Work on the fuel tank. This might be better done in Aug, when it will be warm. I’d recommend getting 6” SS access ports; 4” might be too small. I like the Seabuilt ports. |
− | * | + | |
+ | * Engine maintenance - put oil in the engine, change the filters, etc. | ||
+ | |||
+ | * Change the faucet in the head. It leaks. | ||
+ | |||
+ | * Maintain the manual bilge pumps. Neither works particularly well at this point. | ||
+ | |||
+ | * Electric bilge pumps - does anyone know the status of these? I seem to recall that one or none of these worked well. | ||
+ | |||
+ | * New jib sheets - did these ever get ordered? | ||
+ | |||
+ | * Sails - did the spinnaker, #3, and #1 ever make it to North? It might be too late for these now. | ||
+ | |||
+ | * Fill the propane tank | ||
+ | |||
+ | * Re-install the bolts for the toe rail, using butyl to seal them. | ||
+ | |||
+ | * Replace the foam seals on the forward hatch. The forward hatch generally leaks, so that could be a project for someone. | ||
+ | |||
+ | * Pieces of the wood framing around the companionway hatch are rotted; these will need to be replaced at some point. Not necessarily a pre-launch thing. | ||
+ | |||
+ | * Table nut fasteners - this needs to be done (finally!). | ||
+ | |||
+ | * Inspect and lube steering gear | ||
+ | |||
+ | |||
+ | == 2016 Off-season work == | ||
+ | Based on the skipper's meeting of Tue 27 Sept. Please put your name next to things you'd like to lead/contribute to. | ||
+ | |||
+ | * Mast partners: need to develop a template so we can fashion partners out of hard rubber wedges. | ||
+ | |||
+ | * Topsides: the plan is to pull the boat in Aug 2017 and redo the topsides and replace the engine with a Yanmar. | ||
+ | |||
+ | * Toerails: do this fall. Remove one side and replace that side, using the existing toerail on the other side to crank the new toerail into shape. Will need to fill in the old boltholes (w/ Pro-Set), and then drill new holes. We will pull the boat once we have all the needed goodies - toerails, bolts, drillbits, etc. Challenge: finding new toerail extrusions. | ||
+ | |||
+ | * Engine: re-engine boat with new Yanmar during the time the boat topsides are being repainted. | ||
+ | |||
+ | * Rear quarter plates - do at the same time as toerails. Re-fab out of aluminum or S/S if we are sure the quarter plates will not touch the aluminum toerails. | ||
+ | |||
+ | * Deck core rot: could be a minor matter. Scott to find the right moisture meter to survey deck and hull. | ||
+ | |||
+ | * Fuel tank: old one will be removed and replaced with a new solid tank in same spot as old tank. Will outsource work/ have work overseen by someone who has experience doing this. Adam to take lead. | ||
+ | |||
+ | * Jib and Main sheets: replace now before end of 2016 season. New jib sheets should be a smaller diameter than the current sheets. Get length & diameter to Fran. | ||
+ | |||
+ | * Bow roller/ electric windlass/ hawsepipe: Look into getting this on the boat. Fran thinks this is important for safety. Violeta to research. | ||
+ | |||
+ | * Take asym to North for repair estimate (Adam) | ||
+ | |||
+ | * Bilge pumps: fix diaphragm pump, diagnose submersible pump, fix cockpit manual pump. | ||
+ | |||
+ | Smaller things: | ||
+ | * Red dinghy motor - take to Crystal Cove. Engine does not idle well. | ||
+ | * Get gray dinghy motor from C.C. | ||
+ | * Solar panel needs to be more permanently installed. Eric to lead. | ||
+ | * Replace faucet in head | ||
+ | * Table nut fasteners - this needs to be done (finally!). | ||
+ | * wood at forward end of companionway - needs repair. wood at forward end of companionway is also rotten. | ||
+ | * New brakes for wheel lock - Ted to take lead. | ||
+ | * Inspect steering gear | ||
+ | * Address crack in spreader bracket | ||
+ | * Spot paint mast after prep. | ||
+ | * hooks on shrouds to hold Spin hlyd | ||
+ | Things to not do: | ||
+ | * paint the bottom - this will happen in Aug 2017. Bottom to be painted with Shark White or MIT Gray so we can see when it is dirty. | ||
+ | |||
+ | == Pre-splash 2016 Tasklist == | ||
+ | * Fix engine oil leaks - Lloyd. Someone sent by Lloyd worked on the leak before splash. What's the result? | ||
* Replace nuts on rear quarter fittings - Scott | * Replace nuts on rear quarter fittings - Scott | ||
− | |||
* Inspect steering gear, grease rudderpost - Ted | * Inspect steering gear, grease rudderpost - Ted | ||
− | * Remove corrosion on mast and boom; repaint - Eric | + | * Remove corrosion on mast and boom; repaint - Eric (postponed for next year?) |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
* Touch up topsides paint - Greg says he will take care of this if we have time prior to splash. | * Touch up topsides paint - Greg says he will take care of this if we have time prior to splash. | ||
− | * Cetol woodwork - Violeta | + | * Cetol woodwork - Violeta - postponed for after splash (too cold and/or windy before that) |
− | + | ||
+ | |||
[[(by person)]] | [[(by person)]] | ||
WM shopping list (everyone add stuff here): | WM shopping list (everyone add stuff here): | ||
− | * | + | * 33g CO2 cylinder for Spinlock Deckvest (tall and thin preferred) |
− | + | ||
− | + | ||
− | + | ||
* 50/50 antifreeze - 1 gal. | * 50/50 antifreeze - 1 gal. | ||
Line 45: | Line 103: | ||
* replace jackline mounting points with cleats. Still want to do this, but can be done with the boat in the water | * replace jackline mounting points with cleats. Still want to do this, but can be done with the boat in the water | ||
* Remove, refurbish and reinstall fuel tank - Adam. This is being put off to next fall. | * Remove, refurbish and reinstall fuel tank - Adam. This is being put off to next fall. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Tasks == | == Tasks == | ||
Line 83: | Line 115: | ||
* paint "X DIMENSION" on safety gear with neat, attractive lettering - tyoung | * paint "X DIMENSION" on safety gear with neat, attractive lettering - tyoung | ||
− | * diagnose refrigerator | + | * diagnose refrigerator - vahle |
* finish installing new engine soundproofing/firewall | * finish installing new engine soundproofing/firewall | ||
Line 133: | Line 165: | ||
* install four hooks in forepeak for additional anchor rodes | * install four hooks in forepeak for additional anchor rodes | ||
− | |||
− | |||
* connect aux nav lights | * connect aux nav lights | ||
Line 158: | Line 188: | ||
== Completed Tasks == | == Completed Tasks == | ||
+ | |||
+ | * june16 Repair keel - Greg | ||
+ | * june16 Paint bottom - Greg | ||
+ | * june16 Binnacle light - Ted | ||
+ | * june16 Repair dodger - Adam | ||
+ | * june16 Re-install house batteries - Ted | ||
+ | * march16 Winch #6 torn down and cleaned. rconway, jballew | ||
+ | * march16 Detailed inspection of all inflatable pfds (inflated bladders, checked CO2 cylinders and auto-inflate widgets, any lights). tyoung, vivanova, dan li, sdynes | ||
+ | * march16 Set mast bird line screws to correct depth - goberbrunner | ||
+ | * march16 Restitch wheel cover - thall | ||
+ | * march16 Fix fuel gauge - jatraina | ||
+ | * march16 Clean, buff and Propspeed prop - ebrown, vivanova | ||
+ | * march16 * Condition batteries - Ted (done) | ||
+ | * march16 * Replace damaged NMEA terminator for anemometer on masthead - Ted (done) | ||
+ | * march16 * Replace prop shaft zincs. - vivanova | ||
+ | * March16 Fabricate new pipe/hose adapters for new raw water pump. - tyoung | ||
+ | * March16 * Inspect running rigging - sdynes | ||
+ | * March16 New blocks for mainsheet These are on the boat. sdynes | ||
+ | * March16 New shackles to fasten traveler adjusting blocks to car - sdynes | ||
+ | * March16 Engine maintenance (change oil/various filters/replace raw water pump) - All filters changed (rconway, vivanova), engine oil changed (rconway), new raw water pump installed (tyoung) | ||
* june15 documents to laminate and keep in nav table - dstrubbe | * june15 documents to laminate and keep in nav table - dstrubbe | ||
** safety equipment location | ** safety equipment location |
Latest revision as of 16:37, 4 February 2017
If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.
Please use the discussion page to discuss the prioritization and content of any of these tasks.
Contents
Pre-2017 splash work
- Clean the bottom. Maybe paint the bottom. The bottom will change color in August, so there’s no need to put two coats of black on, or maybe even get new black bottom paint.
- Work on the fuel tank. This might be better done in Aug, when it will be warm. I’d recommend getting 6” SS access ports; 4” might be too small. I like the Seabuilt ports.
- Engine maintenance - put oil in the engine, change the filters, etc.
- Change the faucet in the head. It leaks.
- Maintain the manual bilge pumps. Neither works particularly well at this point.
- Electric bilge pumps - does anyone know the status of these? I seem to recall that one or none of these worked well.
- New jib sheets - did these ever get ordered?
- Sails - did the spinnaker, #3, and #1 ever make it to North? It might be too late for these now.
- Fill the propane tank
- Re-install the bolts for the toe rail, using butyl to seal them.
- Replace the foam seals on the forward hatch. The forward hatch generally leaks, so that could be a project for someone.
- Pieces of the wood framing around the companionway hatch are rotted; these will need to be replaced at some point. Not necessarily a pre-launch thing.
- Table nut fasteners - this needs to be done (finally!).
- Inspect and lube steering gear
2016 Off-season work
Based on the skipper's meeting of Tue 27 Sept. Please put your name next to things you'd like to lead/contribute to.
- Mast partners: need to develop a template so we can fashion partners out of hard rubber wedges.
- Topsides: the plan is to pull the boat in Aug 2017 and redo the topsides and replace the engine with a Yanmar.
- Toerails: do this fall. Remove one side and replace that side, using the existing toerail on the other side to crank the new toerail into shape. Will need to fill in the old boltholes (w/ Pro-Set), and then drill new holes. We will pull the boat once we have all the needed goodies - toerails, bolts, drillbits, etc. Challenge: finding new toerail extrusions.
- Engine: re-engine boat with new Yanmar during the time the boat topsides are being repainted.
- Rear quarter plates - do at the same time as toerails. Re-fab out of aluminum or S/S if we are sure the quarter plates will not touch the aluminum toerails.
- Deck core rot: could be a minor matter. Scott to find the right moisture meter to survey deck and hull.
- Fuel tank: old one will be removed and replaced with a new solid tank in same spot as old tank. Will outsource work/ have work overseen by someone who has experience doing this. Adam to take lead.
- Jib and Main sheets: replace now before end of 2016 season. New jib sheets should be a smaller diameter than the current sheets. Get length & diameter to Fran.
- Bow roller/ electric windlass/ hawsepipe: Look into getting this on the boat. Fran thinks this is important for safety. Violeta to research.
- Take asym to North for repair estimate (Adam)
- Bilge pumps: fix diaphragm pump, diagnose submersible pump, fix cockpit manual pump.
Smaller things:
- Red dinghy motor - take to Crystal Cove. Engine does not idle well.
- Get gray dinghy motor from C.C.
- Solar panel needs to be more permanently installed. Eric to lead.
- Replace faucet in head
- Table nut fasteners - this needs to be done (finally!).
- wood at forward end of companionway - needs repair. wood at forward end of companionway is also rotten.
- New brakes for wheel lock - Ted to take lead.
- Inspect steering gear
- Address crack in spreader bracket
- Spot paint mast after prep.
- hooks on shrouds to hold Spin hlyd
Things to not do:
- paint the bottom - this will happen in Aug 2017. Bottom to be painted with Shark White or MIT Gray so we can see when it is dirty.
Pre-splash 2016 Tasklist
- Fix engine oil leaks - Lloyd. Someone sent by Lloyd worked on the leak before splash. What's the result?
- Replace nuts on rear quarter fittings - Scott
- Inspect steering gear, grease rudderpost - Ted
- Remove corrosion on mast and boom; repaint - Eric (postponed for next year?)
- Touch up topsides paint - Greg says he will take care of this if we have time prior to splash.
- Cetol woodwork - Violeta - postponed for after splash (too cold and/or windy before that)
WM shopping list (everyone add stuff here):
- 33g CO2 cylinder for Spinlock Deckvest (tall and thin preferred)
- 50/50 antifreeze - 1 gal.
Things that are important that may need to wait:
- Remove, refurbish and reinstall rear quarter aluminum plates (used for spinnaker turning blocks) - Scott. We may not be able to have these fabbed within our timeline.
- Repair soft spots on deck: over head, just aft of fwd stbd cleat, other? Not this year
- Remount boom winch - Scott. I looked at this a few days ago, and it looks pretty good.
- Toerails? No.
- re-tab bulkheads to hull? No.
- obtain recent iPad for iNavX -Scott. I’m still working on this...
- sell old AIS/splitter/NMEA2000 -> USB devices. Where are these? I looked for them on the boat and didn’t find them. Selling these would pay for a usable iPad.
- replace jackline mounting points with cleats. Still want to do this, but can be done with the boat in the water
- Remove, refurbish and reinstall fuel tank - Adam. This is being put off to next fall.
Tasks
- REMOVE "mit bluewater" that was written on various equipment with sharpie - tyoung
- lifejackets
- blue cushions
- lifesling
- strobe
- man overboard pole
- paint "X DIMENSION" on safety gear with neat, attractive lettering - tyoung
- diagnose refrigerator - vahle
- finish installing new engine soundproofing/firewall
- install blower vent closure
- tune lifelines
- polish dodger frame
- polish binnacle frame
- replace light in head with LED
- install lights in lazarettes - ebrown
- install lights over engine - ebrown
- upgrade starter battery voltage sense wire to 14 gauge
- install temp sensors on alternator and house batteries
- repair floor edge support in main cabin starboard of nav table
- repair floor edge support port of nav station seat
- install v-berth countertop
- install/fabricate springs to make jib traveler cars stand up
- fabricate pads for traveler car blocks so they will not gouge gelcoat
- fabricate polycarbonate storm board for companionway (24"x28" max dimensions)
- fabricate and install engraved labels on electrical panel (glue not screw)
- trim trysail downhaul
- refurbish pushpit eyes
- fabricate and install new retainers for main cabin table
- design and install floor panel retainers
- swing compass, document with deviation card - tyoung
- fabricate pump retainer for zodiac
- epoxy transom holes on zodiac
- fabricate hinckley-style or cable-actuated lazarette closures
- fabricate gasket for galley porthole
- re-bed pushpit, back with g10 (6 backing plates)
- repair gps antenna thru-rail fitting (port aft transom toerail)
- re-bed binnacle transmission/throttle to stop leaks at cables port and starboard
- refinish interior bilge for better drainage - mwall
- improve drainage throughout boat interior (particularly from tools bin to bilge)
- fix drainage under ice box
- install four hooks in forepeak for additional anchor rodes
- connect aux nav lights
- install propane solenoid indicator at helm
- install freshwater pump indicator at helm
- install bilge pump indicator at helm
- repair scratches in red paint
- port aft
- port midships
- port toerail
- port bow
- stbd midships
- stbd aft quarter
- transom below exhaust
- documents to laminate and keep in nav table - bboval
- create battery switch diagram
- create freshwater schematic
- create bilge schematic
- create septic system schematic
- create 12v schematic - tyoung (See http://sailing.mit.edu/bluewater/X-dimension breakers.pdf)
Completed Tasks
- june16 Repair keel - Greg
- june16 Paint bottom - Greg
- june16 Binnacle light - Ted
- june16 Repair dodger - Adam
- june16 Re-install house batteries - Ted
- march16 Winch #6 torn down and cleaned. rconway, jballew
- march16 Detailed inspection of all inflatable pfds (inflated bladders, checked CO2 cylinders and auto-inflate widgets, any lights). tyoung, vivanova, dan li, sdynes
- march16 Set mast bird line screws to correct depth - goberbrunner
- march16 Restitch wheel cover - thall
- march16 Fix fuel gauge - jatraina
- march16 Clean, buff and Propspeed prop - ebrown, vivanova
- march16 * Condition batteries - Ted (done)
- march16 * Replace damaged NMEA terminator for anemometer on masthead - Ted (done)
- march16 * Replace prop shaft zincs. - vivanova
- March16 Fabricate new pipe/hose adapters for new raw water pump. - tyoung
- March16 * Inspect running rigging - sdynes
- March16 New blocks for mainsheet These are on the boat. sdynes
- March16 New shackles to fasten traveler adjusting blocks to car - sdynes
- March16 Engine maintenance (change oil/various filters/replace raw water pump) - All filters changed (rconway, vivanova), engine oil changed (rconway), new raw water pump installed (tyoung)
- june15 documents to laminate and keep in nav table - dstrubbe
- safety equipment location
- thru-hull locations
- june15 replace reefing lines - tyoung
- june15 install new bilge pump float switch(es) - tyoung
- may15 design and procure solar panels to charge batteries egbrown
- may15 fair keel - greg
- apr15 have sails trimmed - atraina
- apr15repair forward hatch leak (screw holes in starboard hinge)
- apr15 seal port chainplates with butyl tape - atraina
- apr15 replace cracked bilge hoses
- ??jul14 install reading light in quarter berth - ebrown
- ??jul14 install new engine soundproofing/firewall
- ??jul14 replace main cabin hatch hinge pins
- ??jul14 repair keel - greg
- 15jul14 paint bottom - greg, tj, zack (1st coat 25jun14; 2nd coat 27jun14; 5th coat 15jul14)
- 14jul14 reinstall toilet thru-hull - mwall, gwelch
- 14jul14 reinstall galley thru-hull - mwall, gwelch
- 05jul14 complete Duo Charge installation and battery systems rewiring - tyoung, ebrown
- 03jul14 buff topsides - mwall (29 jun), tj (03 jul)
- 02jul14 fix leak at top of gps unit - mwall
- 02jul14 re-mount radar mast - mwall
- 02jul14 re-install port and starboard compasses - mwall
- 02jul14 reinstall forward hatch hinges - mwall
- 01jul14 repitch prop to 24 degrees - atraina (prop still jams in reverse)
- 01jul14 inject grease into rudder post - mwall
- 01jul14 third coat paint to radar mast base casting - mwall
- 01jul14 cut hole in lazarette box for handle - mwall
- 01jul14 apply anti-foul paint to transducer - mwall
- 01jul14 apply third coat of cetol to winch bases - mwall
- 01jul14 glue companionway stair tread - mwall
- 01jul14 fix engine coolant leak (loose hose clamps to hot water heater) - ebrown
- 01jul14 adjust companionway step latch - tyoung
- 01jul14 mount battery monitor - tyoung
- 01jul14 rewire starter battery - ebrown, tyoung
- 01jul14 paint engine switch white - tyoung
- 01jul14 adjust companionway latch length - mwall
- 01jul14 seal compass housings port and starboard - mwall
- 01jul14 re-bed baby stay fittings - mwall, atraina (old screws sheared off)
- 01jul14 refurbish tactical compasses (use toothpaste to polish globes) - atraina
- 01jul14 install cockpit table - mwall
- 01jul14 install rudder post cover - mwall
- 01jul14 re-plumb propane tank drain - mwall
- 01jul14 paint transducer with anti-fouling - mwall
- 30jun14 second coat of gelcoat on all deck repairs - mwall
- 30jun14 apply coat of white enamel to radar mast base - mwall
- 30jun14 plug holes in cockpit table - mwall
- 30jun14 bed companionway hatch closure mechanism - mwall
- 30jun14 plug hole in companionway hatch - mwall
- 30jun14 fix cotter pins in prop screws - mwall
- 30jun14 buff 1/4 of the boat (starboard aft quarter) - mwall
- 30jun14 re-core deck port aft at radar mast base - mwall
- 30jun14 mark prop shaft alignment at shaft/engine coupling, visible from stbd lazarette - mwall
- 29jun14 measure rudder angle - atraina (1 spoke is about 10 degrees)
- 29jun14 begin rewiring batteries, charger, regulator - ebrown, tyoung
- 29jun14 second coat cetol on forward hatch, compass ring - atraina
- 29jun14 install companionway hatch closure - mwall, atraina
- 29jun14 apply cetol to winch bases (4 of them) - mwall
- 29jun14 apply cetol to cheek block bases (6 of them) - mwall
- 29jun14 polish prop shaft - atraina
- 29jun14 coat prop with anti-fouling propspeed - atraina, ebrown
- 29jun14 pitch prop - atraina (12 degrees)
- 29jun14 recondition prop - h&h marine - due back at pavilion 20jun14 (they just sent it to the manufacturer)
- 28jun14 remove cetol drips and sags from starboard grab rail - mwall
- 28jun14 re-bed head dorade - mwall
- 28jun14 sand off drips and sags on companionway boards - mwall
- 27jun14 assess pfd status - kwinstein
- 27jun14 procure then install 1/2" to 1/2" barbed coupling under head sink - kwinstein
- 27jun14 install radar mast backing plate - mwall
- 27jun14 extend companionway drip rails to block water from companionway hatch - mwall
- 27jun14 patch gelcoat and glass divots caused by jib blocks - mwall
- 27jun14 install better chafe protection for hot water hose - mwall
- 27jun14 flush with bleach the space under the head floor - mwall
- 27jun14 inject head cleaner into toilet to displace rotting seawater - mwall
- 27jun14 reroute impeller wiring - mwall
- 27jun14 repair cubby trim in port forward main cabin berth - mwall
- 27jun14 install pumpout handle clamp - mwall
- 27jun14 reinstall dodger frame hardware and dodger frame - mwall
- 27jun14 second coat cetol on companionway hatch sides - mwall
- 25jun14 test polishing of tactical compass globes - mwall
- 25jun14 patch holes mis-drilled by wally foster - greg
- 25jun14 run engine with cooling water attached - sdynes, mwall
- 25jun14 clean aft end of engine - mwall
- 25jun14 first coat cetol on companionway hatch sides - mwall
- 25jun14 repair radar mast base wood parts - mwall
- 25jun14 install zincs - mwall
- 25jun14 remove cetol splatters and spills from deck and forward hatch - mwall
- 25jun14 reinstall dorade hardware - mwall
- 25jun14 fill more deck divots - mwall
- 25jun14 repair stringers to port of mast - tsheehan
- 25jun14 repair side-to-side floor stringer aft of mast - tsheehan
- 25jun14 repair support at forward end of table base in main cabin - tsheehan
- 24jun14 repair floor trim - tsheehan
- 24jun14 repair floor support port side of mast - tsheehan
- 24jun14 polish baby stay stainless parts - mwall
- 24jun14 refurbish head and galley thru-hulls - mwall
- 24jun14 grind more deck divots - mwall
- 22jun14 install 12v sockets at nav station - ebrown
- 22jun14 reroute power to 12v outlets - ebrown
- 22jun14 re-wire hot water heater - ebrown
- 22jun14 fabricate replacement rudder wrench - tyoung
- 22jun14 varnish companionway boards - atraina
- 22jun14 install starter battery charging system - tyoung, ebrown
- 22jun14 install battery monitoring system - tyoung, ebrown
- 22jun14 repair cockpit table - atraina, yuhong
- 21jun14 varnish v-berth sink cover - yuhong
- 21jun14 cetol to grab rails - atraina
- 21jun14 polish stainless steel pushpit - bonnie
- 21jun14 polish dodger frame - bonnie
- 20jun14 fix governor screw - sdynes
- 20jun14 strip brightwork and apply cetol - mostly complete - diane
- 20jun14 refurbish interior lighting system - ebrown
- 17jun14 replace traveler car bearings - mwall
- 15jun14 re-install led strip light wiring and switches - ebrown
- 15jun14 clean cabin interior - atraina, kfalk, ywa
- 14jun14 cetol applied to stern seat, companionway hatch, dorade boxes - tyoung
- 08jun14 two coats of cetol to applied to ? - tyoung, sdynes
- 08jun14 install galley light - ebrown
- 07jun14 install four berth reading lights - ebrown
- 05jun14 re-route hot/cold water to galley - mwall
- 05jun14 clean bilge under engine - mwall
- 05jun14 clean, recondition, reinstall saltwater strainers - mwall
- 05jun14 reinstall/reroute freshwater hoses - mwall
- 05jun14 remove unused head plumbing - mwall
- 04jun14 clean bilge - mwall
- 04jun14 gelcoat dams and other cockpit and deck repairs - mwall
- 04jun14 install hose clamp retainer for rudder bushing - mwall
- 02jun14 recondition tools - bboval
- 02jun14 repair engine fuel leak - sdynes, arne
- 02jun14 repair engine oil leak - sdynes, arne
- 02jun14 clean fuel system - sdynes
- 02jun14 re-stitch steering wheel - adam
- 02jun14 install holding tank vent - sbussolari, mwall
- 02jun14 install hot water heater hoses - sbussolari, mwall
- 21may14 embiggen hole at base of mast - tyoung
- 21may14 seal freshwater tank - sbussolari, mwall
- 21may14 replace broken ground cable (8' long, 1.25" wide copper weave) - tyoung
- 21may14 fill deck voids at forward hatch hinges - tyoung
- 21may14 install access panel with access panel behind nav station - tyoung
- 21may14 replace companionway stair latch hardware - mwall
- 21may14 install companionway dams - mwall
- 21may14 install new holding tank - sbussolari, mwall
- 21may14 install new hot water heater - mwall
- 10may14 repair cockpit table gouge - atraina
- 10may14 seal motor mount - bboval
- 10may14 seal chain plates - mwall (in progress 10apr14)
- 10may14 seal mast boot ring - mwall
- ??may14 polish prop - ivan
- 09may14 repair leak in freshwater tank - sbussolari
- 09may14 re-core old chainplate holes port and starboard - mwall (in progress 10apr14)
- 09may14 re-core deck at dorade box above head - mwall (in progress 10apr14)
- 10apr14 re-install and re-bed rudder bushing - mwall, tyoung
- 10apr14 plug old instrument holes - mwall
- ??apr14 dinghy tuneup - atraina, wherrington, dchinchilla
- 15mar14 remove holding tank - abuck, dlockwood
- 15mar14 remove old septic hoses, pump, and bulkheads - abuck, dlockwood
- 15mar14 remove hot water tank - dromness
- 15mar14 remove and clean mast boot ring - mwall, dromness
- 15mar14 remove chainplate covers - mwall
- 15mar14 assess rudder post bushing - mwall, abuck
- ??jul13 electrical system overhaul - tyoung
- 01jul13 leaks
- saltwater seep 1.5' forward of mast over keel near head - almost none so far in 2013
- saltwater seep in upper bilge next to nav station - about 8 oz per week
- saltwater seep at deepest keel bolt - about 4 oz per week
- 01jul13 install 3 12v sockets in instrument compartment - tyoung
- 01jul13 move engine systems switch from inside stbd locker to switch panel in galley - tyoung
- 01jul13 refinish cockpit table
- 01jul13 fabricate battery retainers - ebrown, mwall
- 01jul13 install retaining bolt in base of mast 3/4" x 8" - mwall
- 01jul13 fabricate cockpit jacklines - sdynes
- 01jul13 assemble first aid kit - elie, mwall
- 01jul13 assemble ditch bag - ulric, sdynes, mwall
- 01jul13 safety wire main sheet blocks (4) - eben
- 01jul13 put 15' lanyard on bucket - atraina
- 01jul13 fabricate new dodger straps - mwall
- 01jul13 put wooden plug on lanyard near each thru-hull - ?
- 01jul13 replace stainless stanchion with aluminum stanchion - mwall
- 01jul13 tune lifelines (install locking screws, tension properly, install standoffs) - mwall
- 01jul13 install hoses and fittings for large manual bilge pump - ulric, mwall
- 01jul13 install mast partners (or pour spartite) - mwall
- 01jul13 bend lower section of trysail track - mwall
- 01jul13 finish man overboard system - atraina
- 01jul13 install battery monitor - tyoung
- 01jul13 install battery regulator - tyoung
- ?????13 get and install a paddle-wheel speedometer - tyoung, gerard
- 08jun13 rebuild port primary (silver) winch - sbussolari
- 08jun13 fabricate floor for zodiac - ebrown, tyoung, kristen, sbussolari, mwall
- 08jun13 refurbish primary winches - sbussolari, dlockwood, dstrubbe, kristen
- 08jun13 first coat of varnish on cockpit table - sergio
- 08jun13 install cleats and clutch on boom - sbussolari, kristen, mwall
- 08jun13 re-mount main sheet fittings on boom - kristen, sbussolari, mwall
- 08jun13 paint boom - dstrubbe, kristen, mwall
- 08jun13 remove corrosion and fittings from boom - atraina, wherrington
- 06jun13 refinish winch handle box (2 coats interlux) - mwall
- 05jun13 clean storage compartments starboard side - mwall
- 05jun13 install rubber bumpers on steering stops - mwall
- 05jun13 install studs for wingnuts on instrument panel back - mwall
- 05jun13 fabricate 8 replacement stanchion bases - mit central machine shop
- 04jun13 move engine switch to galley - tyoung
- 04jun13 install toggle at binnacle - tyoung
- 04jun13 tidy up wiring behind breakers - tyoung
- 04jun13 fabricate oil catch pan - central machine shop
- 04jun13 plug holes in deck by radar post base - sdynes
- 04jun13 bed backstay chainplate - sdynes
- 04jun13 rebuild starboard primary (silver) winch - uferner
- 01jun13 repair gps screen - kwinstein
- 01jun13 move nav switch panel to cockpit - tyoung
- xxxxxxx tap turnbuckles - using cotter pins since they will not shear off
- 21may13 remove coating from old life lines - uferner
- 21may13 install radar reflector halyard - uferner
- 21may13 fix fuel leak at fuel pump - ami
- 20may13 lubricate pawls in cockpit winches - sbussolari
- 20may13 mount manual bilge pump - mwall
- 20may13 shock cord and block to retain flag halyard - sbussolari
- 20may13 adjust primary bilge float switch level (lower by 2 inches) - sbussolari
- 20may13 install new starboard lazy jack line - sbussolari
- 19may13 clean and bleach head to remove urine smell
- 19may13 clean and bleach vberth to remove sewage smells
- 19may13 seal forward inspection portal of freshwater tank - mwall
- 19may13 patch leaks in electric bilge hoses - mwall
- 19may13 install pvc pipe around babystay - mwall
- 19may13 install cotter pins in standing rigging turnbuckles - mwall
- 19may13 rebuild manual bilge pump mount - mwall
- 18may13 pressurize and test stove - sbussolari
- 18may13 install stove stops - sbussolari
- 18may13 flush freshwater tank and hoses - sbussolari
- 18may13 fix fuel leak - atraina, mwall
- 18may13 clean deck and topsides - atraina, sbussolari
- 18may13 clean dinghy - mwall
- 18may13 fabricate bucket handles - atraina
- 18may13 diagnose freshwater tank leak - atraina, sbussolari
- 18may13 replace starboard spinnaker tack cheek block - bussolari
- 18may13 install cockpit pad-eyes - mwall, sbussolari
- 18may13 install man overboard pole - atraina
- 18may13 replace dinghy painter with floating line - atraina
- 18may13 install wood panels over switch and engine panels
- 18may13 re-bed pulpit, back with g10 backing plate 2x 3.5" x 4.5" - sbussolari, mwall
- 17may13 ground pushpit to other grounds - mwall
- 17may13 fabricate backing panels for wiring - mwall
- 17may13 install cockpit pad-eyes - mwall
- 17may13 install cubby retainers - silas
- 17may13 mount cockpit switch panel cubby - mwall
- 16may13 install cubby retainers - silas
- 16may13 dry fit cockpit switch panel - tyoung
- 16may13 seal lazarette hinges - mwall
- 16may13 inject silicone sealant into aft end of mast boot - mwall
- 12may13 fabricate cubby cover retainers (stainless bar plus stainless bolt) - central machine shop
- 12may13 red tender to waterboat marina, then returned to pavilion for better fenders - atraina, sbussolari, mwall
- 12may13 tune shrouds - silas, atraina, mwall
- 12may13 install jib and main - sbussolari, atraina, austin, eben, silas, dan
- 11may13 repair main sail cars - north sails
- 11may13 repair 150 jib - north sails
- 11may13 repair 133 jib - sail has been disposed of
- 11may13 repair spinnaker - north sails
- 11may13 install web and rings in main reef cringles - north sails
- 10may13 re-weld starboard stanchion of pulpit - mit central machine shop
- 10may13 install new lifeline fittings in pulpit - mit central machine shop
- 07may13 install new lazarette gaskets - mwall
- 06may13 remove old seals from lazarette lids - silas, eben
- 06may13 refurbish large winch - eben
- 06may13 refurbish large manual bilge pump - sdynes, mwall, uferner
- 04may13 seal mast boot - mwall
- 04may13 remove silicone flash from new hatch lenses - mwall
- 03may13 another attempt to stop timing case oil leaks - sdynes
- 02may13 lubricate rudder chain - tyoung
- 02may13 install binnacle compass - tyoung
- 02may13 install cleat on deck next to stbd mast winch (stbd jib halyard) - sdynes, mwall
- 02may13 reinstall timing cover on engine to fix oil leak - sdynes
- 02may13 clean and clamp freshwater fill hose - mwall
- 02may13 install windex, garmin wind instrument, tricolor at top of mast - mwall, sdynes
- 02may13 remove mid lifelines, diagnose stanchion bases - mwall
- 01may13 trim silicone flash from windows - mwall
- 01may13 diagnose apparent oil leak aft of engine - coming from engine mount, not engine - mwall
- 30apr13 diagnose bilge leaks - 2 seeps forward of stringer by nav station - mwall
- 30apr13 plug pulpit holes in deck - mwall
- 30apr13 drill holes for starboard cleat - mwall
- 30apr13 assemble zodiac - mwall
- 30apr13 install new lines on zodiac - mwall
- 29apr13 install halyards - sdynes
- 29apr13 install boom and vang - sdynes, mwall
- 29apr13 remove lifelines and pulpit - sdynes, mwall
- 29apr13 trim silicone flash from windows - mwall
- 28apr13 fix dinghy floor leak - sbussolari, tyoung
- 28apr13 fix dinghy fuel leak - there is no leak. pumping too many times results in fuel overflow.
- 26apr13 align and tension steering cable - tyoung
- 26apr13 repair forward starboard handrail attach point - mwall
- 25apr13 fill holes and rotted core in foredeck - mwall
- 25apr13 mount starboard mid-cabin winch - dan, mwall
- 25apr13 fill rotted core near forward end of starboard handrail - mwall
- 25apr13 replace starboard cabin windows - dan, mwall
- 24apr13 install second spinnaker halyard block - mwall
- 24apr13 paint bottom second coat - sdynes, eyal, dan
- 24apr13 install large manual pump strum box - mwall
- 23apr13 Fix the Engine oil leaks - sdynes et al
- 23apr13 seal cockpit holes - 10 on forward bulkhead, 2 or 3 on starboard bulkhead, 2 or 3 port bulkhead - mwall
- 22apr13 install trysail track 2x 12' 7/8" - mwall, eben
- 22apr13 install port forward cabin window - mwall, ebrown
- 22apr13 fabricate strum box for large manual bilge hose - sdynes
- 22apr13 trim spreader cotter pins - gigi, diane
- 22apr13 install halyard messengers - eben, tyoung
- 22apr13 epoxy starter battery box - ilia
- 22apr13 paint house battery box - diane
- 22apr13 first coat bottom paint - ilia, eben, daniel, gigi, diane, sdynes
- 22apr13 replace tab on mast foot platform - mwall
- 21apr13 replace bad house battery - tyoung
- 21apr13 grind and patch bottom flaws - sdynes, mwall
- 21apr13 replace defective forward bilge float switch - tyoung
- 21apr13 refurbish binnacle and steering assembly - tyoung
- 18apr13 paint hatch locking bars with epoxy paint - diane, mwall
- 18apr13 patch hole center forward of keel - mwall
- 18apr13 patch hole starboard side of keel - mwall
- 18apr13 install port aft cabin window - mwall
- 17apr13 replace cabin hatch lens - mwall
- 17apr13 install scupper drain hoses - mwall
- 17apr13 sand bottom - sdynes, diane, dan
- 15apr13 replace head hatch lens - sbussolari, mwall
- 14apr13 fix long batten from main sail - tyoung
- 14apr13 install bronze T fittings for cockpit drainage (1.5" hoses) - mwall
- 14apr13 re-bed mast base ring - sbussolari, mwall
- 14apr13 apply propspeed to prop and shaft - sbussolari
- 11apr13 replace dodger track end caps - mwall
- 11apr13 replace prop shaft zincs (1.25" shaft diameter) - mwall
- 11apr13 grease rudder post - mwall
- 11apr13 replace rudder post zirt fitting - mwall
- 06apr13 tighten rudder stuffing box - tyoung, kcurry, mwall
- 06apr13 replace cotter pins on mast - uferner
- 06apr13 install new babystay brace - mwall
- 06apr13 refurbish baby stay fast pins and shackles
- 06apr13 fix holding tank leak - sbussolari
- 06apr13 move lower fuel pump to less exposed location - sdynes
- 06apr13 inventory anchor rhodes - diane (brown - 100'; orange/blue - 90'; white - 230')
- 04apr13 swap out lube oil filter mount for spin-on mount - sdynes
- 04apr13 move fuel oil filter from inside stbd locker to inside steps - sdynes
- ??mar13 rebuild starboard mid-cabin winch - dan and adam
- ??mar13 replace forward gasket on engine to stop oil leaks - sdynes et al
- ??mar13 replace aft gasket on engine to stop oil leaks - sdynes et al
- ??mar13 evaluate and fix engine oil leaks - sdynes et al
- ??mar13 repair sail cover - wally
- ??mar13 repair dodger zipper - wally
- ??mar13 repair dodger snaps - wally
- ??mar13 repair carpet edges in companionway board storage rack - mwall
- ??mar13 reverse engine kill cable mechanism - tyoung
- 27mar13 trim flash from forward hatch - mwall
- 16mar13 Switched out oil lube filter mount for spin-on mount - uferner
- 09mar13 Repaired boom vang (note adjustment procedure in systems section) - sbussolari
- ??feb13 design and implement drain for well beneath mast - mwall
- ??feb13 cut 1/2" drain hole in mast base plate - mwall
- ??feb13 clean bilge - mwall
- ??jan13 fair keel - greg
- ??jan13 evaluate (and replace) foam in keel - greg
- ??jan13 rebuild rudder - greg
- 12nov12 winterize boat (engine, halyards, sails, freshwater, septic) - sbussolari, ksovie, mwall
- 12nov12 repair wood trim on vberth sink access panel - mwall
- 27oct12 install forward hatch retainer for keeping hatch open - mwall
- ??oct12 connect propane solenoid - tyoung
- 06jul12 boom vang tube - delivered
- 29jun12 boom vang spring - ordered
- 19sep12 worked on port forward winch which was turning both ways. Winch is functional, but needs to be rebuilt - sdynes
- 12sep12 added chafe protection to oil cooler hose (was rubbing on engine mount) - sdynes, dweisman
- 12sep12 replaced steaming nav light and lens - tyoung, sdynes, lbush, dweisman
- 12sep12 replaced spinnaker halyard - sdynes, lbush, dweisman, tyoung
- 12sep12 changed hailing port on transom to Cambridge, MA - tyoung, rdisbrow, lbush, dweisman
- 12sep12 fender step installed tyoung
- 10aug12 changed transmission oil - sdynes
- 10aug12 lubricated main outhaul track and car with a light coating of winch grease - sdynes
- 10aug12 unscrewed cap ove rudder post, used anti-sieze compound when replacing - sdynes
- 13jul12 re-bed forward hatch plexiglass and hinges - mwall, jwarner, jspitzberg
- 13jul12 re-install mast boot - mwall
- 13jul12 re-bed chain plates - mwall, jwarner, jspitzberg
- 13jul12 install pvc storage tubes in starboard lazarette - jwarner, jspitzberg
- 12jul12 6 pfds to boat - tyoung
- 12jul12 2 life jackets into dock box (from pavilion?) - tyoung
- 12jul12 re-mount companionway board storage rack in starboard lazarette - mwall
- 11jul12 repair and refinish wooden boarding ladder - tyoung
- 11jul12 wrenches into wraps - jwarner
- 11jul12 install wastebin on galley cabinet door - jwarner
- 11jul12 rebuild companionway board storage box - tyoung
- 11jul12 refurbish steering wheel brake - tyoung
- 11jul12 re-bed traveler rail - port end is loose - sbussolari
- 11jul12 coaming - gaps between wood and fiberglass - mwall
- 10jul12 connect GPS NMEA0183 output to VHF radio - tyoung
- 07jul12 connect footlights - tyoung
- 07jul12 replace corroded nav light sockets at bow - tyoung
- 07jul12 connect blower - tyoung
- 07jul12 connect fridge - tyoung
- 06jul12 connect wind/depth/GPS instruments via NMEA2000 network - tyoung
- 04jul12 connected stern light - tyoung
- 03jul12 connect sidelights - tyoung
- 03jul12 replace traveler hardware - sbussolari
- 03jul12 install new traveler car - sbussolari
- 03jul12 install new end controls - sbussolari
- 03jul12 re-bed head dorade tube and dorade - mwall
- 03jul12 seal cockpit holes - 2 compasses - mwall
- 03jul12 install new blower hood at stbd aft toerail - mwall
- 03jul12 remount and seal garmin instruments
- 02jul12 fix oil filter leak - big leak at top of blue filter housing on aft end of engine - sdynes
- 02ul12 fabricate oil catch pan - temporary solution from three foil trays - sdynes
- 01jul12 install dinghy registration sticker - tyoung
- 01jul12 stow remaining bluewater gear at pavilion - mwall, tyoung
- 01jul12 tune life lines, recondition turnbuckles and shackles - ebrown
- 01jul12 re-seat pulpit - ebrown
- 01jul12 bring remaining gear to boat - sbussolari, tyoung
- 01jul12 rebed main sheet (2) and main halyard (1) cheek blocks - sbussolari, brehrig
- 01jul12 reinstall dinghy u-bolt, dock lines, and lock - mwall
- 01jul12 fix dinghy painter - mwall
- 01jul12 unplug propane enclosure drain - brehrig
- 01jul12 clean propane enclosure - brehrig
- 01jul12 clean ice box - mwall
- 01jul12 clean head ceiling - ebrown
- 01jul12 plug two holes in aft toerail - mwall
- 01jul12 fabricate oil catch pan - temporary solution from two foil trays - mwall
- 30jun12 installed lock on dock box - mwall
- 30jun12 re-tie dinghy bow/stern lines - ebrown
- 30jun12 properly configure dinghy straps - ebrown
- 30jun12 sort out dinghy equipment (extra pumps/hoses, etc), put single spare in dock box - ebrown
- 30jun12 install fast pins on locking bars - mwall
- -skip-- replace alternator belt (40" 25-9425) - does not need replacement, as smaller will not work - sdynes
- 30jun12 replace broken boom vang tackle (6:1) and line - mwall
- 30jun12 5 halyard blocks at base of mast for 1/2" line - sbussolari
- 30jun12 2 main sheet blocks for 1/2" line - mwall
- 30jun12 install exhaust riser insulation - mwall, tyoung
- 30jun12 install jib - sbussolari
- 30jun12 clean and grease rudder rack and pinion - ebrown
- 30jun12 mount gps and instruments - tyoung
- 30jun12 mount new blower - mwall
- 29jun12 glass over former cooler access on port lazarette - sbussolari, tyoung
- 29jun12 glass over hole above garmin chartplotter - tyoung
- 29jun12 strip and bleach ceiling above starboard berths - ebrown, sbussolari
- 29jun12 strip and bleach ceiling above port berths - ebrown
- 29jun12 strip and bleach ceiling above nav berth - ebrown
- 29jun12 procure bag for dinghy pump/hose - purple bag at pavilion, can hang from dingy seat
- 28jun12 manual bilge pump tested and repaired - uferner, scott
- 28jun12 aft pair of 32in winches rebuilt - uferner, scott
- 28jun12 clean cabinets between main cabin and v-berth
- 28jun12 clean v-berth hull - mwall
- 28jun12 drill hole in nav station floorboard - mwall
- 24jun12 replace forward hatch gasket - sdynes
- 24jun12 adjust seal on prop shaft to reduce shaft heat buildup - sdynes, tyoung
- 24jun12 install navigation lights sub-panel - tyoung
- 24jun12 re-install radio, radar, & engine instrument panel
- 24jun12 install horn button
- 23jun12 Re-install engine instruments panel - tyoung
- 23jun12 replace engine indicator panel plexiglass - tyoung
- 22jun12 replace raw water strainer mesh - sdynes
- 22jun12 replace raw water strainer gasket - sdynes
- 18jun12 secure freshwater faucet in v-berth - mwall
- 18jun12 refurbish dinghy - ksovie, ebrown
- 18jun12 rebed freshwater in thru-deck - sbussolari, sdynes
- 18jun12 install mast boot (temporary) - mwall
- 18jun12 repair main cabin floor support port side of mast base - simon
- 18jun12 install hooks in v-berth cabinets - uferner
- 18jun12 diagnose and repair fuel supply problem - sdynes
- 16jun12 christen the head - sbussolari, mwall
- 16jun12 leak-test septic system - sbussolari
- 16jun12 clean and deploy guppy - mwall
- 16jun12 clean and install dorade vents - uferner
- 16jun12 plug leaks in mast ring - sbussolari, mwall
- 16jun12 plug holes in nav table - sbussolari
- 16jun12 inflate fenders - uferner
- 16jun12 seal deck holes - 30-some screw holes for interior grab rails - sbussolari
- 16jun12 seal deck holes - 6 from old jam cleats - sbussolari
- 16jun12 seal deck holes - 6 from old aluminum track along starboard side of companionway - sbussolari
- 16jun12 seal deck holes - re-bed old baby-stay hard point - sbussolari
- 16jun12 seal cockpit holes - 2 in port lazarette drain gulley - sbussolari
- 15jun12 re-thread and refurbish soap dispenser at galley - mwall
- 14jun12 repair engine compartment panels and hinges - danderson
- 12jun12 secure nav station stool - mwall
- 12jun12 install new exhaust riser - mwall
- 12jun12 reconnect coolant hoses - mwall
- 12jun12 flush and replace coolant - tyoung, mwall
- 11jun12 replace two port-side oil hoses - tyoung
- 11jun12 replace engine exhaust - sdynes
- 11jun12 replace seawater impeller - sdynes
- 11jun12 replace/clean primary fuel filter - sdynes
- 11jun12 replace/clean fuel/water separator - sdynes
- 10jun12 change oil - sdynes, tyoung
- 10jun12 re-plumb engine shutoff - tyoung
- ??jun12 strip peeling paint in cabin interior - tyoung, ksovie, others
- ??jun12 bleach interior surfaces to kill mildew - tyoung, ksovie, others
- 02jun12 reinstalled v-berth sink hatch with finger catch - dca
- 02jun12 repaired galley floor stringer - dca
- 26may12 reinstalled companionway steps - dca
- 21may12 second coat of bottom paint to stbd keel surface - mwall
- 21may12 re-bed chain plates - mwall (6 hours)
- 21may12 fabricate steel backing plates for part of large chain plates
- 20may12 buff topsides - mwall (3 hours)
- 20may12 install mast hardware - tyoung
- 20may12 repair more wiring - tyoung
- 20may12 apply fastprop to propellor and shaft - ebrown
- 20may12 fabricate g10 backing plates for chain plates - mwall
- 20may12 seal rotted core at chain plates - mwall
- 20may12 paint starboard keel surface first coat - mwall
- 20may12 paint head thru-hull first coat - mwall
- 19may12 check and rewire 12V system - tyoung
- 19may12 second coat of paint on mast spots - eric
- 19may12 remove blower vent, worn jam cleat - larry
- 19may12 second coat of bottom paint touchup - uferner
- 19may12 apply more filler on keel - uferner
- 19may12 install head thru-hull - simon
- 19may12 remove corroded backing plates for chain plates - mwall
- 19may12 replace exhaust thru-hull - mwall
- 19may12 paint transducer - mwall
- 18may12 remove compasses for refurbishment - tyoung
- 18may12 install new floorboard - sbussolari
- 18may12 plumb refurbished toilet - sbussolari
- 18may12 install new breakers, wiring - tyoung
- 18may12 grind epoxy from chainplates - mwall
- 18may12 install new starter motor - tyoung, mwall
- 18may12 bottom paint touchup - mwall
- 17may12 clean waterline - dhealey, uferner
- 17may12 polish prop - retro
- 13may12 repair broken floor support in galley - danderson
- 17may12 install terminator for mast wind instruments - tyoung
- 17may12 install horn on mast - tyoung
- 17may12 paint mast - mar, mangle, tyoung
- 11may12 repair mast corrosion - mwall, kwinstein, tyoung, sbussolari
- ??may12 install bilge switches (2, illuminated when pump on) - tyoung
- ??may12 tidy up electrical wiring in nav area - tyoung
- 17may12 sand/grind cracks in bottom - sdynes
- 17may12 apply filler to bottom cracks - sdynes, tyoung, retro
- 17may12 paint the bottom - dhealey, uferner, sdynes, mar, retro
- 17may12 install new engine mount - mangle
- 14may12 clear obstructions from drainage tubes under primary winches - tyoung
- 14may12 remove unused wedges from worn jam cleats - mwall
- 14may12 remove starter motor - tyoung, mwall
- 14may12 sand hull to prep for paint - retro, dweisman
- 14may12 clean waterline - uferner, dweisman
- 14may12 sand/grind/feather keel - sdynes
- 14may12 sand epoxy on mast - ebrown
- 14may12 plug 4 holes in rudder - retro
- 14may12 replace zincs on propellor shaft - dweisman
- 14may12 remove 5200 scraps from thru-hulls - tyoung, mwall
- ??mar12 replace septic system hoses - sbussolari
- ??may12 install holding tank - sbussolari
- ??may12 rebuild toilet - sbussolari
- ??may12 fabricate head floorboard - sbussolari, thall
- 10may12 figure out better path for traveler lines and cleats - decision made to use 4:1 traveler with cam cleats on ends
- ??mar12 replace fractured compass glass on pedestal
- ??apr12 fix nav station clock - tyoung
- ??may12 install saltwater washdown pump in galley - simon
- ??may12 freshwater: install new hoses - simon
- ??may12 freshwater: install new faucets in head/cabin - simon
- ??may12 freshwater: install saltwater pre-wash to galley sink - simon
- ??may12 freshwater: install new drain hoses - simon
- ??may12 freshwater: refurbish and install pump, accumulator, filter - simon
- 10may12 re-core part of foredeck - wfoster
- ??apr12 diagnose and repair cracks on deck around jib halyard block
- ??apr12 inspect chainplates and mast rigging
- ??apr12 re-plumb and rebuild/replace manual bilge pumps (one manual pump installed)
- ??apr12 rewire and re-plumb primary (diaphram) bilge pump
- ??apr12 install secondary (submersible) bilge pump
- 26apr12 drill hole for saltwater hand pump
- ??mar12 install new thru-hull valves
- 18feb12 remove toilet floorboard for repair - sbussolari
- 18feb12 remove batteries from boat - ebrown, tyoung
- 18feb12 clean bilge well - ebrown
- 18feb12 clean bildge - ebrown, mwall
- 18feb12 clean engine - mwall
- 18feb12 remove hot water heater - tyoung
- 18feb12 remove propane fittings - tyoung
- 18feb12 clean cockpit hull interior - kwinstein, tyoung
- 18feb12 refine septic system layout - sbussolari
- 18feb12 refine bilge system layout - kwinstein
- 18feb12 tighten tent - ebrown
- 15feb12 clean bilge - mwall, ebrown, swatts
- 15feb12 remove old bilge hoses - kwinstein
- 04feb12 remove headliner and trim - simon, mwall
- 04feb12 remove unused wiring - tyoung
- 04feb12 remove freshwater hoses and corroded fittings - simon
- 04feb12 remove riser and exhaust hose - mwall
- 04feb12 clean deck, collect old parts - keith
- 15jan12 eliminate rudder leaks - wfoster
- ??oct11 shorten dinghy painter to 2 dinghy boat lengths
- ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
- ??oct11 install float switch on primary bilge pump
- 01oct11 Installed interior dogging handles on aft hatch - sbussolari
- 24sep11 installed dorade vents - stefie tellex
- 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
- 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
- 15sep11 create as-is septic schematic - ted
- 11sep11 install security wire in dinghy - eric
- 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
- 11sep11 install winch holders in cockpit - mwall
- 11sep11 install dodger to reduce water through coaming and companionway
- 11sep11 install reefing line - thall
- 11sep11 replace screws on lazarette latches - eric, simon
- 11sep11 clean bilge - ksovie, bdeffenbaugh
- 11sep11 install mast boot tape - mwall
- 10sep11 install temporary oil catchpan
- 10sep11 inventory of lines on board - kwinstein and stellex
- 10sep11 septic diagram - kwinstein and stellex
- 10sep11 re-rig lazy jack lines - mwall
- 10sep11 tighten lifelines - sbussolari
- 03sep11 Commission Dinghy and berth at Waterboat Marina - ted