Difference between revisions of "(by person)"

From MITNA
Jump to: navigation, search
(Lloyd:)
(Eric:)
Line 8: Line 8:
  
 
==Eric:==
 
==Eric:==
* Remove corrosion on mast and boom; repaint - Eric  We should work on the boom and the mast. No progress on this yet that I know of.
+
 
(think there is propspeed at the pav, but not much)
+
 
* Binnacle light - Eric (can be done after splash)
 
* Binnacle light - Eric (can be done after splash)
  

Revision as of 13:55, 30 March 2016

Edit to show progress...

Greg:

  • Repair keel - Greg. Greg has made good progress, Franny will push for him to complete the keel for launch.
  • Paint bottom.
  • Take boom to boat. Greg is doing this.

Greg should provide guidance wrt bottom, mast/boom and topsides painting.

Eric:

  • Binnacle light - Eric (can be done after splash)

Scott:

  • Replace nuts on rear quarter fittings ( 3 to go ) - Scott

Ted:

  • Replace damaged NMEA terminator for anemometer on masthead - Ted
  • Inspect steering gear, grease rudderpost - Ted
  • Condition batteries

Adam:

  • Repair dodger - Adam
  • Inflate red dinghy, coat with ArmorAll, move to Waterboat.

Other:

  • Take cushions from pav to boat (shortly before launch)