Difference between revisions of "(by person)"
From MITNA
(→Lloyd:) |
(→Eric:) |
||
Line 8: | Line 8: | ||
==Eric:== | ==Eric:== | ||
− | + | ||
− | + | ||
* Binnacle light - Eric (can be done after splash) | * Binnacle light - Eric (can be done after splash) | ||
Revision as of 13:55, 30 March 2016
Edit to show progress...
Greg:
- Repair keel - Greg. Greg has made good progress, Franny will push for him to complete the keel for launch.
- Paint bottom.
- Take boom to boat. Greg is doing this.
Greg should provide guidance wrt bottom, mast/boom and topsides painting.
Eric:
- Binnacle light - Eric (can be done after splash)
Scott:
- Replace nuts on rear quarter fittings ( 3 to go ) - Scott
Ted:
- Replace damaged NMEA terminator for anemometer on masthead - Ted
- Inspect steering gear, grease rudderpost - Ted
- Condition batteries
Adam:
- Repair dodger - Adam
- Inflate red dinghy, coat with ArmorAll, move to Waterboat.
Other:
- Take cushions from pav to boat (shortly before launch)