Difference between revisions of "Task: Install bilge switches"
From MITNA
m (Install bilge switches moved to Task: Install bilge switches) |
|
(No difference)
|
Revision as of 12:38, 14 April 2012
- The fused wires directy attached to the house batteries will be removed.
- A 30-amp breaker will be installed above the galley breaker panel that will be "always on". The breaker will be wired to the connection on the house battery switch that is always connected to the house battery.
- A 10 AWG cable will be run from the bilge breaker to a barrier terminal strip under the nav table.
- This terminal strip will be used to distribute power to the bilge pumps (see drawing).