m (re-re-juggle tasks to group 2 for Fran)
(status "DONE"s, add "sawhorses"; list "pavilion" tasks)
Line 5: Line 5:
 
* Move mast from aboard to on ground (Frannie to request boatyard)
 
* Move mast from aboard to on ground (Frannie to request boatyard)
  
== Tasks That Must Be Done Soon (Before It Freezes) ==
+
== Tasks That Must Be Done Soon (Before it Freezes) ==
  
 
* Winterize engine (ThomS)
 
* Winterize engine (ThomS)
Line 12: Line 12:
 
** Fog Cylinders
 
** Fog Cylinders
 
** Drain and flush old antifreeze from cooling system and add fresh antifreeze
 
** Drain and flush old antifreeze from cooling system and add fresh antifreeze
** Drain salt-water from raw cooling system. and/or below
+
** <strike>Drain salt-water from raw cooling system. and/or below</strike>
 
** Add antifreeze to salt-water system/exhaust pot (bio-friendly)
 
** Add antifreeze to salt-water system/exhaust pot (bio-friendly)
 
* Drain Freshwater tanks
 
* Drain Freshwater tanks
Line 22: Line 22:
 
== Other Tasks That Should Be Done Soon ==
 
== Other Tasks That Should Be Done Soon ==
  
* Bring (borrow/buy):
 
** water hose (c.150-foot)
 
 
* Install Winter Cover (needs mast moved to ground first) (crew)
 
* Install Winter Cover (needs mast moved to ground first) (crew)
 
-
 
-
* Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
+
* Tasks to be done at Pavilion:
* Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)  
+
** Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
* Get mainsail washed and perform any necessary maintenance (Frannie)
+
** Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)  
* Get Genoa Washed (Frannie) {{discuss}}
+
** Get mainsail washed and perform any necessary maintenance (Frannie)
 +
** Get Genoa Washed (Frannie) {{discuss}}
 +
 
  
 
== Done Tasks ==
 
== Done Tasks ==
Line 35: Line 35:
 
* Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
 
* Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
 
* Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
 
* Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
 +
* Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
 +
* Make sawhorses to store mast on - DONE 12-13Nov - Dave A, ThomS
  
  
 
== Equipment Borrowed from Sailors, to be returned after winterizing ==
 
== Equipment Borrowed from Sailors, to be returned after winterizing ==
 
 
* Extension ladder (return after spring launch) - ThomS
 
* Extension ladder (return after spring launch) - ThomS
 +
* Hose (c.20-feet section) - ThomS
  
 
== External Links ==
 
== External Links ==

Revision as of 22:47, 13 November 2007

Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location

Tasks That Must Be Done First

  • Move mast from aboard to on ground (Frannie to request boatyard)

Tasks That Must Be Done Soon (Before it Freezes)

  • Winterize engine (ThomS)
    • Change Engine Oil and Filter
    • Change Transmission Fluid
    • Fog Cylinders
    • Drain and flush old antifreeze from cooling system and add fresh antifreeze
    • Drain salt-water from raw cooling system. and/or below
    • Add antifreeze to salt-water system/exhaust pot (bio-friendly)
  • Drain Freshwater tanks
  • Add non-toxic antifreeze to freshwater system.
  • Add non-toxic antifreeze to head/holding tank [discuss ]
  • Add antifreeze/rocksalt to bilge (or get the last few inches of water out) [discuss ]
  • Top up batteries' charges [discuss ]

Other Tasks That Should Be Done Soon

  • Install Winter Cover (needs mast moved to ground first) (crew)

-

  • Tasks to be done at Pavilion:
    • Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
    • Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)
    • Get mainsail washed and perform any necessary maintenance (Frannie)
    • Get Genoa Washed (Frannie) [discuss ]


Done Tasks

  • Lock up bow anchor - DONE 04Nov - ThomS
  • Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
  • Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
  • Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
  • Make sawhorses to store mast on - DONE 12-13Nov - Dave A, ThomS


Equipment Borrowed from Sailors, to be returned after winterizing

  • Extension ladder (return after spring launch) - ThomS
  • Hose (c.20-feet section) - ThomS