Difference between revisions of "Winterizing"
From MITNA
(reformat some tasks; status DONE) |
m (re-reformat & shuffle items) |
||
Line 4: | Line 4: | ||
* Move mast from aboard to on ground (Frannie to request boatyard) | * Move mast from aboard to on ground (Frannie to request boatyard) | ||
− | |||
== Tasks That Must Be Done Soon (Before It Freezes) == | == Tasks That Must Be Done Soon (Before It Freezes) == | ||
Line 27: | Line 26: | ||
* Bring up (from Conn.) winter cover and its frame - DONE 08Nov - AmyS & ThomS | * Bring up (from Conn.) winter cover and its frame - DONE 08Nov - AmyS & ThomS | ||
* Install Winter Cover (needs mast moved to ground first) (crew) | * Install Winter Cover (needs mast moved to ground first) (crew) | ||
− | * Remove battens and dutchman rig from mainsail & furl neatly | + | * Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew) |
* Get mainsail washed and perform any necessary maintenance (Frannie) | * Get mainsail washed and perform any necessary maintenance (Frannie) | ||
− | * Furl Genoa neatly, find a sailbag (crew) | + | - - NOTE: mainsail is at Pavilion, in most-westerly bay |
− | + | * Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew) | |
+ | * Get Genoa Washed washed (Frannie) {{discuss}} | ||
+ | |||
+ | == Done Tasks == | ||
* Lock up bow anchor - DONE 04Nov - ThomS | * Lock up bow anchor - DONE 04Nov - ThomS | ||
+ | * Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS | ||
* Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS | * Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS | ||
Revision as of 00:52, 10 November 2007
Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location
Contents
Tasks That Must Be Done First
- Move mast from aboard to on ground (Frannie to request boatyard)
Tasks That Must Be Done Soon (Before It Freezes)
- Winterize engine (ThomS)
- Change Engine Oil and Filter
- Change Transmission Fluid
- Fog Cylinders
- Drain and flush old antifreeze from cooling system and add fresh antifreeze
- Drain salt-water from raw cooling system. and/or below
- Add antifreeze to salt-water system/exhaust pot (bio-friendly)
- Drain Freshwater tanks
- Add non-toxic antifreeze to freshwater system.
- Add non-toxic antifreeze to head/holding tank [discuss ]
- Add antifreeze/rocksalt to bilge (or get the last few inches of water out) [discuss ]
- Top up batteries' charges [discuss ]
Other Tasks That Should Be Done Soon
- Bring (borrow/buy):
- water hose (c.150-foot)
- Bring up (from Conn.) winter cover and its frame - DONE 08Nov - AmyS & ThomS
- Install Winter Cover (needs mast moved to ground first) (crew)
- Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
- Get mainsail washed and perform any necessary maintenance (Frannie)
- - NOTE: mainsail is at Pavilion, in most-westerly bay
- Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)
- Get Genoa Washed washed (Frannie) [discuss ]
Done Tasks
- Lock up bow anchor - DONE 04Nov - ThomS
- Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
- Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
Equipment Borrowed from Sailors, to be returned after winterizing
- Extension ladder (return after spring launch) - ThomS