Revision history of "X-Dimension Winterization"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 13:01, 22 April 2018Scott (Talk | contribs). . (3,140 bytes) (+3,140). . (Created page with "This is a list of things that must be done to make the boat ready for winter: -- 1-2 weeks before haul-out: * complete all needed paperwork for haul-out marina (e.g. winter s...")